Tender Details
Particulars | Details |
---|---|
Title |
Proposed Construction Of Stbt Road From Ghodake House To Tatyasaheb Borude House For Shrigonda Municipal Council Ahilyanagar
|
Description |
Proposed Construction Of Stbt Road From Ghodake House To Tatyasaheb Borude House For Shrigonda Municipal Council Ahilyanagar
|
Organisation | Directorate Of Municipal Administration | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5500 |
EMD | 16100 |
Tender Value | |
Place | Shrigonda Municipal Shrigonda Ahilyanagar |
Link |
AAAAAAAAAA Login to view |
Start Date | May 22, 2025 19:30 |
End Date |
10/06/2025 ( 17 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreTower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line
Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route
Read moreTower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreIndependent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreCs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreof your Industry type