Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Mp Plan Fund 2024 25 Renovation Of Tail End Field Channel From Ch 0/650 0/900 Km Of Kalapetty No.1 Branch Canal (Mambillipadam) General Civil Work
|
| Description |
General Mp Plan Fund 2024 25 &Amp#X0d
Renovation Of Tail End Field Channel From Ch&Amp#X0d
0/650 0/900 Km Of Kalapetty No.1 Branch&Amp#X0d
Canal (Mambillipadam) General Civil Work
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2025_Irrig_741129_1 |
|
Reference Number |
IRR/PI/TR/3229/2024_5_1_1/1 |
| Tender Fee | 2760 |
| EMD | 25417 |
| Tender Value | - |
| Place | Kalappetty |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1191773 |
| Start Date | February 20, 2025 23:30 |
| End Date |
Expired
01/03/2025
Expired 590 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General-mp-2024-25-renovation of field channel ing from tail end field channel of thenur branch canal from ch 0/000 km to ch0/124 km-general civil work
The work has been included under the plan fund&#x0d for the renovation of the field channels of the&#x0d malampuzha project.the proposed field channel&#x0d of thenur branch canal have been constructed&#x0d long years back. theside walls and foundation of&#x0d the
Read moreGeneral-mp-2025-26 renovation of field channel-ing from sluice at ch6/650 of kavilpad branch canal at ch 0/050 to ch 0/150 km-general civil work
Right bank canal (rbmc) ing from&#x0d malampuzha dam 0/000 km is up to 32/000 km&#x0d long and having main branch canals such as&#x0d puthupariyaram , kavilpad, vallikode i,&#x0d vallikode ii, kinavallur, thenur, mankurussi,&#x0d
Read moreGeneral-mp-2025 -2026-renovation of field channel of left di-ing from tail end right divertion field channel ch 0/275 km of thenur branch canal-in b/w ch 0/140 km to 0/405 km-general civil work
This work has been included under the plan fund&#x0d for the modernisation of the field channels of the&#x0d malampuzha project. the proposed field channel&#x0d of thenur branch canal have been constructed&#x0d long years back. the side walls and foundatio
Read moreCada work mp vdy 2023 24 improvement of mangalam distributory tail end cheenakkapadam field channel ch 0 000 to 0 750km
Earth work cement concrete centering and shuttering steel reinforcement plastering filling
Read moreGeneral-mp-2025-26- renovation works to the field channel-ing from sluice ch1/650 km of vallikode i branch canal from ch0/600 km to 0/650 at mahali and tail end field channel at kulakkanampotta sarpakavu- general civil work
Muttikulangara padashekaram, the side walls&#x0d and foundation of the proposed portion of the&#x0d field channel is seen damaged and the whole&#x0d structure needs to be rectified for the efficient&#x0d conveyance of water and also to reduce leakage.&#x0d hence the p
Read moreGeneral-mp-2025-26-renovation to field channel-ing from the tail end of pudhupariyaram branch canal from ch 0/100 km to 0/200 km-general civil work
Right bank canal (rbmc) ing from&#x0d malampuzha dam 0/000 km is up to 32/000 km&#x0d long and having main branch canals such as&#x0d puthupariyaram
Read moreGeneral-mp-plan fund 2024-25- renovation of field channel between ch.0/500 - 0/650 km 0f sluice no.3 at odanur branch canal of peringottukurissi canal at aalamthod in mathur panchayath-general civil work
General-mp-plan fund 2024-25-&#x0d renovation of field channel between ch.0/500 -&#x0d 0/650 km 0f sluice no.3 at odanur branch canal&#x0d of peringottukurissi canal at aalamthod in&#x0d mathur panchayath-general civil work
Read moreGeneral mp rbc 2023-24 modernisation of cada field channel urgent rectification works to the field channel in between ch 0/000km to 0/100 km offtake at ch 0/031 km of pathiripapala branch canal general civil work
Demolishing,earth work,pcc 1 4 8 , pcc 1 3 6,pcc1 1.5 3,centring and shutering,re inforcement,
Read moreof your Industry type