Tender Details
Particulars | Details |
---|---|
Title |
General Mp Plan Fund 2024 25 Renovation Of Field Channel Between Ch.0/500 0/650 Km 0f Sluice No.3 At Odanur Branch Canal Of Peringottukurissi Canal At Aalamthod In Mathur Panchayath General Civil Work
|
Description |
General Mp Plan Fund 2024 25 &Amp#X0d
Renovation Of Field Channel Between Ch.0/500 &Amp#X0d
0/650 Km 0f Sluice No.3 At Odanur Branch Canal&Amp#X0d
Of Peringottukurissi Canal At Aalamthod In&Amp#X0d
Mathur Panchayath General Civil Work
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2025_Irrig_741145_1 |
Reference Number |
IRR/PI/TR/3052/2024_5_1_1/1 |
Tender Fee | 1870 |
EMD | 21185 |
Tender Value | |
Place | Thachangad |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1191829 |
Start Date | February 20, 2025 23:30 |
End Date |
05/03/2025 ( Expired 46 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pothundy project - 2024 - 25 - rectification works between ch . 3/100 km and 3/ 160km of kairady branch canal
The work is proposed for the urgent&#x0d rectification of kairady branch canal
Read moreGeneral wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km
General wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km
Read moreGeneral-wp- cada (2024-2025) modernization of field channal offtakes fromthe ch 0-330 km (lhs) of koundan canal in between ch 0-250 km to 0-750 km
General-wp- cada (2024-2025) modernization of field channal offtakes fromthe ch 0-330 km (lhs) of koundan canal in between ch 0-250 km to 0-750 km
Read moreLac-ads-lac - ads works-construction of box culvert at nettissery branch canal ch. 0/300 km-general civil work
Lac-ads-lac - ads works-construction of&#x0d box culvert at nettissery branch canal ch.&#x0d 0/300 km-general civil work
Read moreGeneral-emergency-mp- rbc-urgent removal of rock by blasting and stacking stone to the edges at rbc main canal ch 6/200 km and removing top slabs and cleaning of cut cover at ch 6/100 km -general civil work
Big rock was fallen from the right side bund&#x0d of rbc main canal at ch 6/200 km. since the&#x0d region was high cutting area, rock was only&#x0d found during canal cleaning process.as the&#x0d rock was huge and it will cause obstruction for&#x0d water distributi
Read moreGeneral wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work
General wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work
Read moreGeneral wp cada 2024 2025 modernization of field channel offtakes from ch 02 500 km of chalai lbc canal in between ch 0 000km to 0 350 km 1408 2024 general civil work
General wp cada 2024 2025 modernization of field channel offtakes from ch 02 500 km of chalai lbc canal in between ch 0 000km to 0 350 km 1408 2024 general civil work
Read moreDeposit-kyip 2023-24-construction of mampoyil ulliyeri south canal road in ulliyeri grama panchayath(canal inspection road between ch. 2/108 km and ch. 2/235 km of narath distributory)-general civil work
Deposit-kyip 2023-24-construction of&#x0d mampoyil ulliyeri south canal road in ulliyeri&#x0d grama panchayath(canal inspection road&#x0d between ch. 2/108 km and ch. 2/235 km of&#x0d narath distributory)-general civil work
Read moreGeneral- plan cheramangalam scheme 2024-25 - improvements and urgent rectification work to canal shutters 16a branch canal 2nd reach, main canal shutter at ch- 5/950, vadakketara branch sluice no.1 - general mechanical work
General- plan cheramangalam scheme 2024-25 - improvements and urgent rectification work to canal shutters 16a branch canal 2nd reach, main canal shutter at ch- 5/950, vadakketara branch sluice no.1 - general mechanical work
Read moreGeneral-rp 2024-25-moonnuperia cherumavilayi pinarayi road -bc overlay and construction of drain and covering slab in moonnuperia cherumavilayi pinarayi road between km.3/730 to 4/600 (padannakkara to ch mukku)-general civil work-1
General-rp 2024-25-moonnuperia cherumavilayi pinarayi road -bc overlay and construction of drain and covering slab in moonnuperia cherumavilayi pinarayi road between km.3/730 to 4/600 (padannakkara to ch mukku)-general civil work-1