Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Wbpwdeeiali/Niet11 Bsd/25 26/1
|
Description |
Repair And Restoration Of Diamond Harbour Road From Ch 7 095 Km To 12 270 Km In Different Stretches At Eastern Lane Side Due To Road Cutting By Cesc Kmc Etc During The Year 2025 2026
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2025_WBPWD_855631_1 |
Reference Number |
WBPWDEEIALI/NIET11BSD/25-26 |
Tender Fee | 0 |
EMD | 97315 |
Tender Value | |
Place | ALIPORE |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1915319 |
Start Date | May 30, 2025 20:05 |
End Date |
18/06/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreUpgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Read moreAAAAAAAAAA
Login to viewFulbari kumarganj road from 15.00 kmp to 22.00 kmp (in stretches), urgent patch repairing works under dakshin dinajpur highway division in the district of dakshin dinajpur - during the year 2025-2026.
Read moreAAAAAAAAAA
Login to viewProtection work by uc bullah on chak fulbubi culvert to protect from heavy scouring on kachuberia - gangasagar road at sagar island under diamond harbour highway division during the year 2025-26
Read moreFdr / maintenance of different roads under sabroom pwd (r and b) sub-division during the year 2025-26/ sh - soling, paver block, repair to pot holes, road side protection, removal of unsuitable soil etc.
Fdr / maintenance of different roads under sabroom pwd (r and b) sub-division during the year 2025-26/ sh - soling, paver block, repair to pot holes, road side protection, removal of unsuitable soil etc.
Read moreAAAAAAAAAA
Login to viewRepair of damaged stretches of jessore road from ch 6 00 km to ch 6 20 km ch 6 700 km to ch 7 50 km created due to incessant rainfall during the ongoing monsoon under kolkata north division p w dte during the year 2025 2026
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Read moreMtc of road from jirania block complex near old ps to mandwi road via vidyasagar colony during the year 2025-26 sh patch metalling, grouting, patch carpeting and other allied works. (l 2.10 km, ch.0.00 km to ch.2.10 km).
Mtc of road from jirania block complex near old ps to mandwi road via vidyasagar colony during the year 2025-26 sh patch metalling, grouting, patch carpeting and other allied works. (l 2.10 km, ch.0.00 km to ch.2.10 km).
Read moreof your Industry type