Tender Details

Particulars Details
Title
Procurement Of Cup Lock Quick Erect Scaffolding Materials For Boiler At Unit No. 2 Of 2x600 Mw At Sstpp, Mppgcl, Dongalia
Description
Procurement Of Cup Lock Quick Erect Scaffolding Materials For Boiler At Unit No. 2 Of 2x600 Mw At Sstpp, Mppgcl, Dongalia
Organisation Madhya Pradesh Power Generating Company Limited | State Govt. and UT
Tender Id 2024_MPPGC_383443_1
Reference
Number
PT-3007/MM-I
Tender Fee 1295
EMD 21500
Tender Value
Place SSTPP, MPPGCL, Dongalia
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=488462
Start Date April 03, 2025 00:25
End Date

21/04/2025 ( Expired 1 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Opportunity maintenance for associated auxiliaries of tg of unit no. 01 and 02 for fy 2025 26 at 2x10 mw, bhps iv, mppgcl, jhinna

Work contract for opportunity maintenance for associated auxiliaries of tg of unit no. 01 and 02 for fy 2025 26 at 2x10 mw, bhps iv, mppgcl, jhinna

Read more
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa

Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa

Read more
Epcc package for linear low-density polyethylene (lldpe) / high density polyethylene (hdpe) swing unit (2 no s) (2x575 ktpa) of bina petrochemicals and refinery expansion project (bprep),madhya pradesh

Epcc package for linear low-density polyethylene (lldpe) / high density polyethylene (hdpe) swing unit (2 no s) (2x575 ktpa) of bina petrochemicals and refinery expansion project (bprep),madhya pradesh

Read more
Procurement of complete lp turbine rotor assembly with turbine blades for 2x600mw at unit no. 1 and 2 at sstpp, mppgcl, dongalia

Procurement of complete lp turbine rotor assembly with turbine blades for 2x600mw at unit no. 1 and 2 at sstpp, mppgcl, dongalia

Read more
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur

Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur

Read more
Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.

Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.

Read more
Procurement of knife gate valve along with its spares for bottom ash hopper, buffer hopper and silo at ash handling plant of 2x600 mw units at sstpp,mppgcl,dongalia

Procurement of knife gate valve along with its spares for bottom ash hopper, buffer hopper and silo at ash handling plant of 2x600 mw units at sstpp,mppgcl,dongalia

Read more
Construction of catch water drain, sump and pump house for arresting seepage from ash pond sstpp stage-ii and recycle seepage water into recovery water system of sstpp stage-ii at dongalia

Construction of catch water drain, sump and pump house for arresting seepage from ash pond sstpp stage-ii and recycle seepage water into recovery water system of sstpp stage-ii at dongalia

Read more
De silting of silt sandy clay and other assorted materials from 01 no cw pump chamber with 01 no fire pump chamber big of unit 2 at intake pump house btps

De silting of silt sandy clay and other assorted materials from 01 no cw pump chamber with 01 no fire pump chamber big of unit 2 at intake pump house btps

Read more
Checking and inspection of welding condition of wall hanging insulator clomping anchor point of jock bus moose insulator with suitable dp test and standard safe scaffolding for unit 2

Checking and inspection of welding condition of wall hanging insulator clomping anchor point of jock bus moose insulator with suitable dp test and standard safe scaffolding for unit 2.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise