Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction And Precast Pre Stressed Concrete Element Of Size 3m X 2.4m For Underground Support At East And West Sides Of 950 Level 2nd Vertical Shaft At Ukwa Mine.
|
| Description |
Construction And Precast Pre Stressed Concrete Element Of Size 3m X 2.4m For Underground Support At East And West Sides Of 950 Level 2nd Vertical Shaft At Ukwa Mine.
|
| Organisation | MOIL Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_MOIL_789738_1 |
|
Reference Number |
MOIL/MOIL LIMITED/CMC/24-25/ET/122 |
| Tender Fee | 0 |
| EMD | 1.51 Lakh |
| Tender Value | |
| Place | Ukwa Mine |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1094140 |
| Start Date | March 07, 2025 20:30 |
| End Date |
Expired
01/04/2025
Expired 476 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction and erection of precast pre stressed concrete elements for underground support 1750 level of 1st vertical shaft at ukwa mine.
Construction and erection of precast pre stressed concrete elements for underground support 1750 level of 1st vertical shaft at ukwa mine.
Read moreDrilling of muck generation hole at 950 level of 2nd vertical shaft at ukwa mine.
Drilling of muck generation hole at 950 level of 2nd vertical shaft at ukwa mine.
Read moreTub pushing from all level in(underground) to surfaces at 2nd vertical shaft ukwa mine
Tub pushing from all level in(underground) to surfaces at 2nd vertical shaft ukwa mine
Read moreProposal for tub from all level in(underground ) to surface at 2nd vertical shaft at ukwa mine
Proposal for tub from all level in(underground ) to surface at 2nd vertical shaft at ukwa mine
Read moreProposal for tub pushing from all level in(underground) to surface at 2nd vertical shaft at ukwa mine
Proposal for tub pushing from all level in(underground) to surface at 2nd vertical shaft at ukwa mine
Read moreDriling of muck generation hole at 1150 level 2nd vertical shaft at ukwa mine.
Driling of muck generation hole at 1150 level 2nd vertical shaft at ukwa mine.
Read moreConstruction of ventilation fan room for 2nd vertical shaft of ukwa mine.
Construction of ventilation fan room for 2nd vertical shaft of ukwa mine.
Read morePushing of lhd loaded tubs from 6th and 8th level of 2nd vertical shaft at ukwa mine
Pushing of lhd loaded tubs from 6th and 8th level of 2nd vertical shaft at ukwa mine
Read moreLowering of 3x240sqmm dwa copper cable from surface to 6l underground at 2nd vertical shaft of ukwa mine
Lowering of 3x240sqmm dwa copper cable from surface to 6l underground at 2nd vertical shaft of ukwa mine
Read moreNdt of csg components of 1st and 2nd vertical shaft at ukwa mine.
Ndt of csg components of 1st and 2nd vertical shaft at ukwa mine.
Read moreof your Industry type