Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction And Precast Pre Stressed Concrete Element Of Size 3m X 2.4m For Underground Support At East And West Sides Of 950 Level 2nd Vertical Shaft At Ukwa Mine.
|
| Description |
Construction And Precast Pre Stressed Concrete Element Of Size 3m X 2.4m For Underground Support At East And West Sides Of 950 Level 2nd Vertical Shaft At Ukwa Mine.
|
| Organisation | MOIL Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_MOIL_789738_1 |
|
Reference Number |
MOIL/MOIL LIMITED/CMC/24-25/ET/122 |
| Tender Fee | 0 |
| EMD | 1.51 Lakh |
| Tender Value | - |
| Place | Ukwa Mine |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1094140 |
| Start Date | March 07, 2025 20:30 |
| End Date |
Expired
01/04/2025
Expired 564 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drivage of 1 no. underground vertical air shaft from seam-iii to seam-i to establish return airway system for vijay west ug mine at rani atari sub area
Drivage of 1 no. underground vertical air shaft from seam-iii to seam-i to establish return airway system for vijay west ug mine at rani atari sub area
Read moreConstruction and erection of precast pre stressed concrete elements for underground support 1750 level of 1st vertical shaft at ukwa mine.
Construction and erection of precast pre stressed concrete elements for underground support 1750 level of 1st vertical shaft at ukwa mine.
Read moreDrilling of muck generation hole at 950 level of 2nd vertical shaft at ukwa mine.
Drilling of muck generation hole at 950 level of 2nd vertical shaft at ukwa mine.
Read moreTub pushing from all level in(underground) to surfaces at 2nd vertical shaft ukwa mine
Tub pushing from all level in(underground) to surfaces at 2nd vertical shaft ukwa mine
Read moreProposal for tub from all level in(underground ) to surface at 2nd vertical shaft at ukwa mine
Proposal for tub from all level in(underground ) to surface at 2nd vertical shaft at ukwa mine
Read moreLowering of 3x240sqmm dwa copper cable from surface to 6l underground at 2nd vertical shaft of ukwa mine
Lowering of 3x240sqmm dwa copper cable from surface to 6l underground at 2nd vertical shaft of ukwa mine
Read moreProposal for tub pushing from all level in(underground) to surface at 2nd vertical shaft at ukwa mine
Proposal for tub pushing from all level in(underground) to surface at 2nd vertical shaft at ukwa mine
Read moreOutsourcing of operation and general maintenance of load haul dump loader at 2nd vertical underground of ukwa mine
Outsourcing of operation and general maintenance of load haul dump loader at 2nd vertical underground of ukwa mine
Read moreDrain cleaning at 1650 l 1st vertical at ukwa mine.
Drain cleaning at 1650 l 1st vertical at ukwa mine.
Read moreRestoration of pipeline network of 9500ch underground section at ukwa mine.
Restoration of pipeline network of 9500ch underground section at ukwa mine.
Read moreof your Industry type