Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tub Pushing From All Level In(underground) To Surfaces At 2nd Vertical Shaft Ukwa Mine
|
| Description |
Tub Pushing From All Level In(underground) To Surfaces At 2nd Vertical Shaft Ukwa Mine
|
| Organisation | MOIL Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_MOIL_777856_1 |
|
Reference Number |
LT/MINING/UK/AGT/2024-25/1098 DT. 09.11.2024 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | UKWA MINE |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1081842 |
| Start Date | November 09, 2024 23:30 |
| End Date |
Expired
16/11/2024
Expired 656 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Proposal for tub pushing from all level in(underground) to surface at 2nd vertical shaft at ukwa mine
Proposal for tub pushing from all level in(underground) to surface at 2nd vertical shaft at ukwa mine
Read moreProposal for tub from all level in(underground ) to surface at 2nd vertical shaft at ukwa mine
Proposal for tub from all level in(underground ) to surface at 2nd vertical shaft at ukwa mine
Read morePushing of lhd loaded tubs from 6th and 8th level of 2nd vertical shaft at ukwa mine
Pushing of lhd loaded tubs from 6th and 8th level of 2nd vertical shaft at ukwa mine
Read moreTub pushing from underground to surface at ch 5000 section ukwa mine
Tub pushing from underground to surface at ch 5000 section ukwa mine
Read moreTub pushing from underground to surface at ch 5000 section ukwa mine
Tub pushing from underground to surface at ch 5000 section ukwa mine
Read morePushing and unloading of lhd tubs from 1050l 7th level face to otc or level inof 2nd vertical shaft of ukwa mine
Pushing and unloading of lhd tubs from 1050l 7th level face to otc or level inof 2nd vertical shaft of ukwa mine
Read moreDriling of muck generation hole at 1150 level 2nd vertical shaft at ukwa mine.
Driling of muck generation hole at 1150 level 2nd vertical shaft at ukwa mine.
Read moreDrilling of muck generation hole at 950 level of 2nd vertical shaft at ukwa mine.
Drilling of muck generation hole at 950 level of 2nd vertical shaft at ukwa mine.
Read moreof your Industry type