Tender Details

Particulars Details
Title
Lowering Of 3 X240 Sqmm Dwa Copper Cable From Surface To 6 L Underground At 2nd Vertical Shaft Of Ukwa Mine
Description
Lowering Of 3 X240 Sqmm Dwa Copper Cable From Surface To 6 L Underground At 2nd Vertical Shaft Of Ukwa Mine
Organisation MOIL Limited | Central Govt. Ministry/Department
Tender Id 2024_MOIL_772266_1
Reference
Number
UK/ELECT/2024-25/880
Tender Fee 0
EMD 0
Tender Value -
Place MOIL LIMITED, UKWA MINE
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1076108

Start Date September 19, 2024 23:30
End Date
Expired 30/09/2024

Expired 705 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Proposal for tub from all level in(underground ) to surface at 2nd vertical shaft at ukwa mine

Proposal for tub from all level in(underground ) to surface at 2nd vertical shaft at ukwa mine

Read more
Proposal for tub pushing from all level in(underground) to surface at 2nd vertical shaft at ukwa mine

Proposal for tub pushing from all level in(underground) to surface at 2nd vertical shaft at ukwa mine

Read more
Tub pushing from all level in(underground) to surfaces at 2nd vertical shaft ukwa mine

Tub pushing from all level in(underground) to surfaces at 2nd vertical shaft ukwa mine

Read more
Tub pushing from underground to surface at ch 5000 section ukwa mine

Tub pushing from underground to surface at ch 5000 section ukwa mine

Read more
Tub pushing from underground to surface at ch 5000 section ukwa mine

Tub pushing from underground to surface at ch 5000 section ukwa mine

Read more
Lowering of 3cx240sqmm copper dwa cable from 1550l to 1350l at 2nd vertical shaft.

Lowering of 3cx240sqmm copper dwa cable from 1550l to 1350l at 2nd vertical shaft.

Read more
Construction of ventilation fan room for 2nd vertical shaft of ukwa mine.

Construction of ventilation fan room for 2nd vertical shaft of ukwa mine.

Read more
Laying of 4 gi vertical pipeline for dewatering at 2nd vertical shaft of ukwa mine.

Laying of 4 gi vertical pipeline for dewatering at 2nd vertical shaft of ukwa mine.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise