Tender Details
Particulars | Details |
---|---|
Title |
Deposit Sitc Of 1.5 Hp Borewell Motor At Central Prison Kannur Freedom Food Unit Motor General Electrical Work
|
Description |
Deposit Sitc Of 1.5 Hp Borewell Motor At&Amp#X0d
Central Prison Kannur Freedom Food Unit&Amp#X0d
Motor General Electrical Work
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 555 |
EMD | 2792 |
Tender Value | |
Place | KANNUR |
Link |
AAAAAAAAAA Login to view |
Start Date | May 19, 2025 23:30 |
End Date |
26/05/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at chandipur 33/11
Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at chandipur 33/11
Read moreProvision of plc panels and electrical work for operating motor operated valves at wadilube installation
Provision of plc panels and electrical work for operating motor operated valves at wadilube installation
Read moreGeneral-construction of upper floors for dialysis unit at taluk head quarters hospital, harippad-work-composite work
General-construction of upper floors for &#x0d dialysis unit at taluk head quarters hospital, &#x0d harippad-work-composite work
Read moreConstruction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, culvert, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at propose
Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, culvert, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at propose
Read moreConstruction of cemoc centre - electrical installation work at l.b. dutta rh, south 24 parganas - sitc of ups.
Construction of cemoc centre - electrical installation work at l.b. dutta rh, south 24 parganas - sitc of ups.
Read moreDynamic balancing of press motor cooling fan impellers in pm#3 - electrical at tnpl unit - i
Dynamic balancing of press motor cooling fan impellers in pm#3 - electrical at tnpl unit - i
Read moreRepairs of 6 cusec x 8 meter head hc pump and 30 hp motor of unit 1 along with allied works at lis ismailpur
Repairs of 6 cusec x 8 meter head hc pump and 30 hp motor of unit 1 along with allied works at lis ismailpur
Read moreAnnual plan- malappuram district panchayath construction of anganawadi at nalisheri no 95 in tripangode grama pancayath - 909-25 -general electrical work (retender)
Annual plan- malappuram district panchayath construction of anganawadi at nalisheri no 95 in tripangode grama pancayath - 909-25 -general electrical work (retender)
Read moreDeposit-providing ac unit in lab at phc ezhamkulam-general electrical work
Deposit-providing ac unit in lab at phc ezhamkulam-general electrical work
Read moreConstruction of cemoc centre - electrical installation work at l.b. dutta rh, south 24 parganas - sitc of fda system.
Construction of cemoc centre - electrical installation work at l.b. dutta rh, south 24 parganas - sitc of fda system.
Read moreof your Industry type