Tender Details

Particulars Details
Title

AAAAAAAAAA

Login to view
Description
Laying Of 200mm Dia Ci Sewage Pumping Main From Rance Reality To Manicakam Nagar Sps In Depot 5, Area I
Organisation CMWSS Board | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 23500
Tender Value
Place Chennai
Link

AAAAAAAAAA

Login to view
Start Date June 17, 2025 20:30
End Date

24/06/2025 ( 17 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh

Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Read more
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Read more
Special repair to joinery and carpentry work in respect of jcos / or md accn in dstv area under age b/r i of ge hisar at hisar mil stn.

Special repair to joinery and carpentry work in respect of jcos / or md accn in dstv area under age b/r i of ge hisar at hisar mil stn.

Read more
Construction of c.c. road from main road to toilet in chandrashekhar ward, sagar- parshad nidhi

Construction of c.c. road from main road to toilet in chandrashekhar ward, sagar- parshad nidhi

Read more
Short term maintenance to kanaka durga flyover from km. 0/000( 269/900) to km. 5/122 (275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh

Short term maintenance to kanaka durga lyover from km.0/000( 269/900) to km.5/122(275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh

Read more

Construction of storm water drainage line from mahispota underpass to muragacha pumping station....panihati municipality and bilkanda gram panchayet area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise