Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Retaing Wall On Arnala Kalamb Rangaon Holi Road Odr 101 Ch 1/00 To 4/00 Tal Vasai Dist Palghar
|
Description |
Construction Of Retaing Wall On Arnala Kalamb Rangaon Holi Road Odr 101 Ch 1/00 To 4/00 Tal Vasai Dist Palghar
|
Organisation | RDD-CEO-PALGHAR | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2860 |
EMD | 40000 |
Tender Value | |
Place | VASAI |
Link |
AAAAAAAAAA Login to view |
Start Date | May 21, 2025 18:30 |
End Date |
28/05/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreConstruction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Read moreConstruction of bituminous layer over pcc road from phase 3 e1 to phase 4 a-1-1 balidih industrial area jiada.
Construction of bituminous layer over pcc road from phase 3 e1 to phase 4 a-1-1 balidih industrial area jiada.
Read moreConstruction of hl bridges at ch.195/2, ch.198/2, ch.198/3, ch. 199/4, ch. 208/1, ch.208/4, ch.210/1, ch.211/1 on nh-143 (old nh-23)in the state of jharkhand.
Construction of hl bridges at ch.195/2, ch.198/2, ch.198/3, ch. 199/4, ch. 208/1, ch.208/4, ch.210/1, ch.211/1 on nh-143 (old nh-23)in the state of jharkhand.
Read moreConstruction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Read more- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road
- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road
Read moreConstruction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Read moreConstruction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.
Read moreof your Industry type