Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Special Strengthening Work On Kuti Janapav Road (Vr) In Km Total Length 2.20 Km Proposed 1.00 Km (Ch 1200 2200), Kumthi Jakukhedi To Chainpura Road (Vr) Total Length 0.73 Km (Ch 220 730)
|
| Description |
Manpur Kothi Approach Road (Vr) Total And Proposed Length 1.00 Km (Ch 0 1000), Naharkhodra Chasya Sherkund Goklya Road Total Length 6.00 Km Proposed Mhow Mandleshwar To Ab Road Nh 3 Old Road Total Length 7.31 Km Total Proposed Length 11.92 Km
|
| Organisation | PWD- Roads and Bridges | State Govt. and UT |
| Tender Id | 2024_PWDRB_335349_1 |
|
Reference Number |
71/SAC/2023-24/Indore Dated - 20-02-2024 (2) |
| Tender Fee | 16534 |
| EMD | 2.49 Lakh |
| Tender Value | - |
| Place | INDORE |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=393805 |
| Start Date | February 21, 2024 15:30 |
| End Date |
Expired
27/02/2024
Expired 962 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening work of anarad to nihaldevi road at ch 34/2 length 350 m and ch 34/6 length 150 m) total length 500m
Strengthening work of anarad to nihaldevi road at ch 34/2 length 350 m and ch 34/6 length 150 m) total length 500m
Read moreB.t. renewal work of mohani to silthar road length 2.20 km , vikrampur kanya ashran approach road langth 1.80 km and dalka bandha to bilgada road langth 1.18 km total length 5.18 km (1st call)
B.t. renewal work of mohani to silthar road length 2.20 km , vikrampur kanya ashran approach road langth 1.80 km and dalka bandha to bilgada road langth 1.18 km total length 5.18 km (1st call)
Read moreSpecial repair work from ch. 0.00 to ch. 10.80 mohania to bhabhua total length 10.80 km of nh219 for the year 2026 27 in the state of bihar.
Special repair work from ch. 0.00 to ch. 10.80 mohania to bhabhua total length 10.80 km of nh219 for the year 2026 27 in the state of bihar.
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreImprovement of road from kashiabari to jambuguri high school (from ch.0.00m to ch.5230.00m, total length 5.23 km) by providing sdbc, under btc for the year 2025-26. tn_46_04
Improvement of road from kashiabari to jambuguri high school (from ch.0.00m to ch.5230.00m, total length 5.23 km) by providing sdbc, under btc for the year 2025-26. tn_46_04
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreSpecial repair work construction of rcc drain size 1.00 m x 1.25 m from ch. 96.600 to ch. 99.100 total length 5.00 km in daudnagar market of nh 139 for the year 2026-27
Special repair work construction of rcc drain size 1.00 m x 1.25 m from ch. 96.600 to ch. 99.100 total length 2 x 2.5 5.0 km in daudnagar market of nh 139 for the year 2026-27
Read moreShort term maintenance contract from ch. 234.970 to ch. 327.920 from ghozadanga to ichamati river in total length 92.95 km of nh-312 under north 24 paragnas district in the state of west bengal
Short term maintenance contract from ch. 234.970 to ch. 327.920 from ghozadanga to ichamati river in total length 92.95 km of nh-312 under north 24 paragnas district in the state of west bengal
Read moreStrengthening work of durgapur fata to bhangaon borawa road at ch 2200 to 2300 and 6970 to 7000 total length 0.13 km. under sub division mandleshwar
Strengthening work of durgapur fata to bhangaon borawa road at ch 2200 to 2300 and 6970 to 7000 total length 0.13 km. under sub division mandleshwar
Read moreConstruction of road from ranipur boro basti to ranipur pwd road, part-i (from ch.0.00m to ch.1370.00m, total length- 1.370 km) by providing gsb under sopd, btc for the fy 2026-27. tn_51_01
Construction of road from ranipur boro basti to ranipur pwd road, part-i (from ch.0.00m to ch.1370.00m, total length- 1.370 km) by providing gsb under sopd, btc for the fy 2026-27. tn_51_01
Read moreof your Industry type