Tender Details

Particulars Details
Title
Construction Of Pump House, Protection Wall And Providing Pumping Main From The Bore Well Site At Cholankurichi To The Existing Sump At Cholankurichi Oht At Ambagarathur For Feeding Water To Jawahar Nagar Oht Distribution Network At Ambagarathur
Description
Construction Of Pump House, Protection Wall And Providing Pumping Main From The Bore Well Site At Cholankurichi To The Existing Sump At Cholankurichi Oht At Ambagarathur For Feeding Water To Jawahar Nagar Oht Distribution Network At Ambagarathur
Organisation Public Works Department | State Govt. and UT
Tender Id 2025_PWDC3_18312_1
Reference
Number
03-06/PW/IPH/2025-26
Tender Fee 525
EMD 73933
Tender Value
Place Karaikal
Link https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=18660
Start Date April 25, 2025 21:45
End Date

09/05/2025 ( Expired 52 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Different work to be performed for making water supply from distribution network for one year at site ward no. 63 and 64. file no. 149/25x9/1.

Different work to be performed for making water supply from distribution network for one year at site ward no. 63 and 64. file no. 149/25x9/1.

Read more
Survey and design of distribution network including providing, laying testing and commissioning of pipelines from rakkas tank via ventuary meter to 600 mm dia main pumping line area between sagartal to jalapur chauraha including jalalpur village and

Survey and design of distribution network including providing, laying testing and commissioning of pipelines from rakkas tank via ventuary meter to 600 mm dia main pumping line area between sagartal to jalapur chauraha including jalalpur village and

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Cc drain

Construction of cc drain from d.no.5-1-17/20 nalli padmakumari house to existing cc drain and rcc culvert at maddalavaripeta main road in 14th ward

Read more
Providing and laying of 160mm od hdpe pipeline from existing of 150mm dia ci pipeline from sree durga temple to shiv colony junction at dollygunj and from range office to dollygunj oht at dollygunj water section, ward no. 17

Providing and laying of 160mm od hdpe pipeline from existing of 150mm dia ci pipeline from sree durga temple to shiv colony junction at dollygunj and from range office to dollygunj oht at dollygunj water section, ward no. 17

Read more
As per nit

Repair/maintenance of water supply repair to&#x0d water pumping main lines and distribution lines&#x0d and connected items at lkt and adm site at af stn&#x0d bowali.

Read more
Construction of sewage pumping station and its allied works at 7th cross street shastri nagar and laying of 200mm dia ci pumping main for a length of 1150m from proposed shastri nagar sps to indra nagar sps in depot 174, area xiii

Construction of sewage pumping station and its allied works at 7th cross &amp#x0d street shastri nagar and laying of 200mm dia ci pumping main for a &amp#x0d length of 1150m from proposed shastri nagar sps to indra nagar sps in &amp#x0d depot 174, area xiii

Read more
Municipal general funds

Construction of cc drain from k.chandra mohan house d. no. 15-2-113 to main road at vivekananda nagar, ward no.21 of palasa- kasibugga municipality under municipal general funds

Read more
Providing sop to improvement scheme of lis haripur to lift water by construction of 2nd stage at village talad by providing 3-phase lt line from existing 100 kva sstn. haripur-ist in e section pattabrowery

Providing sop to improvement scheme of lis haripur to lift water by construction of 2nd stage at village talad by providing 3-phase lt line from existing 100 kva sstn. haripur-ist in e section pattabrowery

Read more
Construction of 02 nos. gates for protection of back water flow from iandfc drains to pwd drain including providing grating at pwd and other department drains intersections at various locations under sub-division-22/swr-ii, pwd during 2025-26.

Construction of 02 nos. gates for protection of back water flow from iandfc drains to pwd drain including providing grating at pwd and other department drains intersections at various locations under sub-division-22/swr-ii, pwd during 2025-26.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise