Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Pump House, Protection Wall And Providing Pumping Main From The Bore Well Site At Cholankurichi To The Existing Sump At Cholankurichi Oht At Ambagarathur For Feeding Water To Jawahar Nagar Oht Distribution Network At Ambagarathur
|
Description |
Construction Of Pump House, Protection Wall And Providing Pumping Main From The Bore Well Site At Cholankurichi To The Existing Sump At Cholankurichi Oht At Ambagarathur For Feeding Water To Jawahar Nagar Oht Distribution Network At Ambagarathur
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2025_PWDC3_18312_1 |
Reference Number |
03-06/PW/IPH/2025-26 |
Tender Fee | 525 |
EMD | 73933 |
Tender Value | |
Place | Karaikal |
Link | https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=18660 |
Start Date | April 25, 2025 21:45 |
End Date |
09/05/2025 ( Expired 52 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Different work to be performed for making water supply from distribution network for one year at site ward no. 63 and 64. file no. 149/25x9/1.
Different work to be performed for making water supply from distribution network for one year at site ward no. 63 and 64. file no. 149/25x9/1.
Read moreSurvey and design of distribution network including providing, laying testing and commissioning of pipelines from rakkas tank via ventuary meter to 600 mm dia main pumping line area between sagartal to jalapur chauraha including jalalpur village and
Survey and design of distribution network including providing, laying testing and commissioning of pipelines from rakkas tank via ventuary meter to 600 mm dia main pumping line area between sagartal to jalapur chauraha including jalalpur village and
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreCc drain
Construction of cc drain from d.no.5-1-17/20 nalli padmakumari house to existing cc drain and rcc culvert at maddalavaripeta main road in 14th ward
Read moreProviding and laying of 160mm od hdpe pipeline from existing of 150mm dia ci pipeline from sree durga temple to shiv colony junction at dollygunj and from range office to dollygunj oht at dollygunj water section, ward no. 17
Providing and laying of 160mm od hdpe pipeline from existing of 150mm dia ci pipeline from sree durga temple to shiv colony junction at dollygunj and from range office to dollygunj oht at dollygunj water section, ward no. 17
Read moreAs per nit
Repair/maintenance of water supply repair to
 water pumping main lines and distribution lines
 and connected items at lkt and adm site at af stn
 bowali.
Read moreConstruction of sewage pumping station and its allied works at 7th cross street shastri nagar and laying of 200mm dia ci pumping main for a length of 1150m from proposed shastri nagar sps to indra nagar sps in depot 174, area xiii
Construction of sewage pumping station and its allied works at 7th cross &#x0d street shastri nagar and laying of 200mm dia ci pumping main for a &#x0d length of 1150m from proposed shastri nagar sps to indra nagar sps in &#x0d depot 174, area xiii
Read moreMunicipal general funds
Construction of cc drain from k.chandra mohan house d. no. 15-2-113 to main road at vivekananda nagar, ward no.21 of palasa- kasibugga municipality under municipal general funds
Read moreProviding sop to improvement scheme of lis haripur to lift water by construction of 2nd stage at village talad by providing 3-phase lt line from existing 100 kva sstn. haripur-ist in e section pattabrowery
Providing sop to improvement scheme of lis haripur to lift water by construction of 2nd stage at village talad by providing 3-phase lt line from existing 100 kva sstn. haripur-ist in e section pattabrowery
Read moreConstruction of 02 nos. gates for protection of back water flow from iandfc drains to pwd drain including providing grating at pwd and other department drains intersections at various locations under sub-division-22/swr-ii, pwd during 2025-26.
Construction of 02 nos. gates for protection of back water flow from iandfc drains to pwd drain including providing grating at pwd and other department drains intersections at various locations under sub-division-22/swr-ii, pwd during 2025-26.
Read moreof your Industry type