Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Icds Centre At Haripara Fishary Para At Nagarukhra I G.P Under Haringhata Panchayat Samity With Ridf Xxvi
|
| Description |
Construction Of Icds Centre At Haripara Fishary Para At Nagarukhra I G.P Under Haringhata Panchayat Samity With Ridf Xxvi
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_ZPHD_567569_1 |
|
Reference Number |
WB/NAD/HGT/NIET-521/23-24 |
| Tender Fee | 0 |
| EMD | 24816 |
| Tender Value | - |
| Place | SUBARNAPUR,HARINGHATA,NADIA |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 12, 2023 19:30 |
| End Date |
Expired
25/09/2023
Expired 1060 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of compound wall inner flooring and drain with culvert at pathapalayam panchayat
Construction of compound wall inner flooring and drain with culvert at pathapalayam panchayat
Read moreConstruction of rcc drain with rcc culvert and sump room for conveyance system and construction of boundary wall at igc aurangabad (phase-i)
Construction of rcc drain with rcc culvert and sump room for conveyance system and construction of boundary wall at igc aurangabad (phase-i)
Read moreTurnkey contract for construction of 01 no new 33kv line at gaya ji of sbpdcl to provide connectivity and electrical infrastructure for 3 nos. of proposed pss for integrated manufacturing centre (imc), gaya ji, bihar for amritsar kolkata integrated centre (akic), gamhariaunder (state plan) with all associated works under sbpdcl
Turnkey contract for construction of 01 no new 33kv line at gaya ji of sbpdcl to provide connectivity and electrical infrastructure for 3 nos. of proposed pss for integrated manufacturing centre (imc), gaya ji, bihar for amritsar kolkata integrated centre (akic), gamhariaunder (state plan) with all associated works under sbpdcl
Read moreConstruction of rcc drain with cover slab from rambharos rai house via sc/st tolla to nahar ward no. - 13 under nagar panchayat pakridayal
Construction of rcc drain with cover slab from rambharos rai house via sc/st tolla to nahar ward no. - 13 under nagar panchayat pakridayal
Read moreConstruction of kanjri west shc, and residential quarter at kanjri panchayat, beldaur block, under khagaria district 2026-27.
Construction of kanjri west shc, and residential quarter at kanjri panchayat, beldaur block, under khagaria district 2026-27.
Read moreConstruction of pcc road and rcc drain with cover slab from durgapuri colony dhirendra ji birju house to krishna ji house under g.m.c. ward no-52 at gaya ji.
Construction of pcc road and rcc drain with cover slab from durgapuri colony dhirendra ji birju house to krishna ji house under g.m.c. ward no-52 at gaya ji.
Read moreConstruction of pcc road & rcc drain with cover slab from manoj yadav h/o via satendra kumar h/o to shivnandan prasad under g.m.c. ward no-52 at gaya ji.
Construction of pcc road & rcc drain with cover slab from manoj yadav h/o via satendra kumar h/o to shivnandan prasad under g.m.c. ward no-52 at gaya ji.
Read moreDesign, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under “har ghar nal ka jal” nischay yojna in areas having ground water quality issues; with electric driven pumps and arsenic removal treatment plant having technology (adsorption/ ion exchange/membrane/nano technology/ etc.) certified by csir or any other institute of national repute.in the district of bhojpur, bihar on turn-key basis with 6 months trial run period and comprehensive op
Design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under “har ghar nal ka jal” nischay yojna in areas having ground water quality issues; with electric driven pumps and arsenic removal treatment plant having technology (adsorption/ ion exchange/membrane/nano technology/ etc.) certified by csir or any other institute of national repute.in the district of bhojpur, bihar on turn-key basis with 6 months trial run period and comprehensive operation and maintenance of 60 months under mukhyamantri grameen peyjal nishchay yojna (quality affected) under p.h. division, ara, ward -3a & 3b of neknam tola panchayat under block-barhara in the district bhojpur. (gr-01)
Read moreDesign, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under “har ghar nal ka jal” nischayyojna in areas having ground water quality issues; with electric driven pumps and arsenic removal treatment plant having technology (adsorption/ ion exchange/ membrane/ nano technology/ etc.) certified by csir or any other institute of national repute. in the district of .bhojpur, bihar on turn-key basis with 6 months trial run period and comprehensive
Design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under “har ghar nal ka jal” nischayyojna in areas having ground water quality issues; with electric driven pumps and arsenic removal treatment plant having technology (adsorption/ ion exchange/ membrane/ nano technology/ etc.) certified by csir or any other institute of national repute. in the district of .bhojpur, bihar on turn-key basis with 6 months trial run period and comprehensive operation and maintenance of 60 months under mukhyamantri grameen peyjal nishchay yojna (quality affected) under p.h. division, ara, block- ara panchayat- mahuli (ward no-10 ) gr-02
Read moreTurn key contract for design, engineering, construction, testing and commissioning of two(02) nos. of 2x10 mva, 33/11 kv new pss at belwdangi & sitalpur in katihar district along with associated 33 kv and 11 kv lines under state plan.
Turn key contract for design, engineering, construction, testing and commissioning of two(02) nos. of 2x10 mva, 33/11 kv new pss at belwdangi & sitalpur in katihar district along with associated 33 kv and 11 kv lines under state plan.
Read moreof your Industry type