Tender Details

Particulars Details
Title
Repair And Maintenance Of Muzaffarpur Darbhanga Supaul Section Of Nh 27 (Old Nh 57) From Km. 0.00 To 145.450 In The State Of Bihar. (Total Length 145.450).
Description
Repair And Maintenance Of Muzaffarpur Darbhanga Supaul Section Of Nh 27 (Old Nh 57) From Km. 0.00 To 145.450 In The State Of Bihar. (Total Length 145.450).
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_247273_1
Reference
Number
NIT No- 289/RO-PATNA/NHAI/2025- 26
Tender Fee 10000
EMD 49.82 Lakh
Tender Value -
Place NHAI, RO- Patna
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=283119

Start Date September 02, 2025 22:10
End Date
Expired 17/09/2025

Expired 395 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of prefabricated/ pre-engineered pota cabin in jail on epc (engineering procurement and construction) basis at muzaffarpur central jail, hajipur divisional jail and sitamarhi, divisional jail. (total no of cabin = 03 nos)

Construction of prefabricated/ pre-engineered pota cabin in jail on epc (engineering procurement and construction) basis at muzaffarpur central jail, hajipur divisional jail and sitamarhi, divisional jail. (total no of cabin = 03 nos)

Read more
Rehabilitation and upgradation of two lane road with paved shoulders on malegaon missing link section of nh461b from akola naka to junction with nh 161 at malegaon bypass (from km 0.00 to 3.00 total length 3.00 km) and 0.00 to 0.460 length of nh753c

Rehabilitation and upgradation of two lane road with paved shoulders on malegaon missing link section of nh461b from akola naka to junction with nh 161 at malegaon bypass (from km 0.00 to 3.00 total length 3.00 km) and 0.00 to 0.460 length of nh753c

Read more
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

Read more
One time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.

One time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.

Read more
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh

Consultancy services for dpr preparation for oti of budhar-umaria (nh-43), ponda nala-shahdol bypass and chilman chowk-dindori-mandla road (nh-543), and dindori-mandla road nh-45 junction and nh-543 junction dindori-kabirchabutra road (nh-45)

Read more
Short term maintenance to nh-17(new) / nh-31(old) for the year 2026-27 from (i) km 816/012 to km 829/000 (length 13.094 km) (ii) km 844/000 to km 858/000 (length 12.506 km) (total length of the project 25.600 km) under abhayapuri const. division

Short term maintenance to nh-17(new) / nh-31(old) for the year 2026-27 from (i) km 816/012 to km 829/000 (length 13.094 km) (ii) km 844/000 to km 858/000 (length 12.506 km) (total length of the project 25.600 km) under abhayapuri const. division

Read more
Consultancy services for authority engineer during operation and maintenance period of chhapra -hajipur section of nh-31 (old nh-19) from km.143.200 to km.209.940 in the state of bihar (total length km. 66.74).

Consultancy services for authority engineer during operation and maintenance period of chhapra -hajipur section of nh-31 (old nh-19) from km.143.200 to km.209.940 in the state of bihar (total length km. 66.74).

Read more
Construction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over suknar river at 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.

Construction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over suknar river at 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.

Read more
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Read more
Construction of high level rcc bridge (16 x 29.85m) in place of old damaged bridge over kiul river at nariyana ghat on nh-333a in 72nd km of khaira-sono road in district of jamui.

Construction of high level rcc bridge (16 x 29.85m) in place of old damaged bridge over kiul river at nariyana ghat on nh-333a in 72nd km of khaira-sono road in district of jamui.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise