Tender Details
Particulars | Details |
---|---|
Title |
Erection And Fabrication Of Over Ground Fire Spray Line 250 Nb 180 Mtr Approx Including Supply Of All Materials At Phase I Near Chp Building To Near Tp2 Area Sg Tpp
|
Description |
Erection And Fabrication Of Over Ground Fire Spray Line 250 Nb 180 Mtr Approx Including Supply Of All Materials At Phase I Near Chp Building To Near Tp2 Area Sg Tpp
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 22746 |
Tender Value | |
Place | Sagardighi Thermal Power Plant Monigram |
Link |
AAAAAAAAAA Login to view |
Start Date | March 04, 2025 15:30 |
End Date |
21/03/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction or repairing of gravel approach road 1900 mtrs, construction of plinth, road over plinth, effluent pits with suitable bundhs or embankment etc,cleaning of plinth, construction cc or rcc foundations with pillow foundation, construction of drwaf wall to suit e 1400 rig out fit at jorajan, nagajan, kathalguri, langakshi, bazaloni and for any other location in cf east area including supply of all materials except cement.
Construction or repairing of gravel approach road 1900 mtrs, construction of plinth, road over plinth, effluent pits with suitable bundhs or embankment etc,cleaning of plinth, construction cc or rcc foundations with pillow foundation, construction of drwaf wall to suit e 1400 rig out fit at jorajan, nagajan, kathalguri, langakshi, bazaloni and for any other location in cf east area including supply of all materials except cement.
Read moreConstruction of gravel approach road 1000.00 mtrs, construction of plinth, road over plinth, effluent pits with suitable bundhs or embankment etc, drilling cleaning of plinth, construction cc or rcc foundations with pillow foundation to suit e 1400 rig out fit for any location in jnk area including supply of all materials except cement.
Construction of gravel approach road 1000.00 mtrs, construction of plinth, road over plinth, effluent pits with suitable bundhs or embankment etc, drilling cleaning of plinth, construction cc or rcc foundations with pillow foundation to suit e 1400 rig out fit for any location in jnk area including supply of all materials except cement.
Read moreNctps i se m ii ichs dn supply and erection of fire hydrant pipe line from overhead tank to dust separation pump house tank and its pipe lines near jt 3
Nctps i se m ii ichs dn supply and erection of fire hydrant pipe line from overhead tank to dust separation pump house tank and its pipe lines near jt 3
Read moreErection and fabrication of over ground fire spray line 250nb 180 mtr approx including supply of all materials at phase i near chp building to near tp2 area sgtpp
Erection and fabrication of over ground fire spray line 250nb 180 mtr approx including supply of all materials at phase i near chp building to near tp2 area sgtpp
Read moreRepair, fabrication and erection of water supply main pipe line 8 inch dia near by back gate, welding of 6 inch dia gi pipe line near by water stock tank and new fitting of pipe line 2 inch dia from 80 b/c take-up drum to 00 level, dismantling and fi
Repair, fabrication and erection of water supply main pipe line 8 inch dia near by back gate, welding of 6 inch dia gi pipe line near by water stock tank and new fitting of pipe line 2 inch dia from 80 b/c take-up drum to 00 level, dismantling and fi
Read moreErection of 3.3kv oh line from 33kv/3.3kv chp substation to dewatering pump station near pond at pragati nagar colony under dipka area (route length - about 1.5km).
Erection of 3.3kv oh line from 33kv/3.3kv chp substation to dewatering pump station near pond at pragati nagar colony under dipka area (route length - about 1.5km).
Read moreFabrication and erection including supply of all materials of fire hydrant line 150nb 180m and 80nb 6m approx of phase ii coal stack yard middle portion of shaded area sgtpp
Fabrication and erection including supply of all materials of fire hydrant line 150nb 180m and 80nb 6m approx of phase ii coal stack yard middle portion of shaded area sgtpp
Read moreAddn altn to external water supply pipe line from rl 150 nad non explosive area and provn of fire escape staircase and fire alarm system and allied works for nkg building p 928 at naval station karanja
Addn altn to external water supply pipe line from rl 150 nad non explosive area and provn of fire escape staircase and fire alarm system and allied works for nkg building p 928 at naval station karanja
Read moreProviding and laying rcc 300 mm i/d storm water line and construction of road gullies and manholes to provide relief to water logging prone area from backside of house no hl 102 to 117, phase 2, s.a.s. nagar and all other works contingent thereto..
Providing and laying rcc 300 mm i/d storm water line and construction of road gullies and manholes to provide relief to water logging prone area from backside of house no hl 102 to 117, phase 2, s.a.s. nagar and all other works contingent thereto..
Read moreErection of tanker filling point to provide regular water supply to the water tanker to sprinkle the water all over the mine at water discharge point, laying of dwc hdpe 90 mm pipe (76 mm internal dia.) pipe from discharge point of delivery line of r
Erection of tanker filling point to provide regular water supply to the water tanker to sprinkle the water all over the mine at water discharge point, laying of dwc hdpe 90 mm pipe (76 mm internal dia.) pipe from discharge point of delivery line of r
Read moreof your Industry type