Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Et/15th/Einghtworks/01/2023
|
Description |
As Per Tender Notic 1 Cosnt Of Latrine Unit Building At Kumbhargaon 2 Cosnt Of W C And Latrin Building At Kumbhargaon 3 S R To W C Unit At Kumbhargaon Maliwasti Gharatwadi 4 S R To W C Unti At Kumbhargaon For Anganwadi Buldg. Kumbahrgaon 1 And Etc
|
Organisation | Government of Maharashtra |
Tender Id | 2023_SOLAP_964268_1 |
Reference Number |
ET/eightworks/15th/01/2023 |
Tender Fee | 300 |
EMD | 0 |
Tender Value | |
Place | V P office Kumbhrgaon Tal Karmala |
Link | https://mahatenders.gov.in |
Start Date | November 21, 2023 22:30 |
End Date |
28/11/2023 ( Expired 572 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreSpecial repair to roof of building no 2(1) 2(2) 4(1) 4(2) and 5(1) 5(2) married qtr at shaitan singh enclave and certain minor works under ge (south) ambala cantt
Special repair to roof of building no 2(1) 2(2) 4(1) 4(2) and 5(1) 5(2) married qtr at shaitan singh enclave and certain minor works under ge (south) ambala cantt
Read moreSpl repair to roof treatment of bldg no 1 2 3 4 14 15 17 18 19 21 31 41 and allied wks at mgsf under ge (w) lko
Spl repair to roof treatment of bldg no 1 2 3 4 14 15 17 18 19 21 31 41 and allied wks at mgsf under ge (w) lko
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreRising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Read moreSupply, installation, testing, commissioning, training and 1 year warranty of advantech dynamic simulator as per scope of work in annexure t1,qty: 2 no s, to ecil-hyderabad.
Supply, installation, testing, commissioning, training and 1 year warranty of advantech dynamic simulator as per scope of work in annexure t1,qty: 2 no s, to ecil-hyderabad.
Read moreModification work of 132kv s/c hisar sadulpur tr. line bw loc no. 328 and 329 at railway track crossing between railway tp point 171/3 and 171/4 of hmg-sdlp section as deposit work of ms. railway (mlin/22.14) on labour rate contract basis
Modification work of 132kv s/c hisar sadulpur tr. line bw loc no. 328 and 329 at railway track crossing between railway tp point 171/3 and 171/4 of hmg-sdlp section as deposit work of ms. railway (mlin/22.14) on labour rate contract basis
Read moreComprehensive annual maintenance contract (camc) for hitachi-hirel make 2x 80 kva -2 sets ups system installed at unit# 1 and 2 ( 2x 250 mw),emerson make 2x 80 kva -2 sets ups system installed at unit# 3 and 4 ( 2x 250 mw) and mini ups system for p
Comprehensive annual maintenance contract (camc) for hitachi-hirel make 2x 80 kva -2 sets ups system installed at unit# 1 and 2 ( 2x 250 mw),emerson make 2x 80 kva -2 sets ups system installed at unit# 3 and 4 ( 2x 250 mw) and mini ups system for p
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreDesign of 400 kv d/c tower type ad /dead end and adspl (special tower) narrow base with quad bersimis conductor (snow zone) for lilo of existing m/s jsw 400 kv d/c baspa 2 to karcham wangtoo-jhakri tl at t-4 to evacuate power from shongtong hep
Design of 400 kv d/c tower type ad /dead end and adspl (special tower) narrow base with quad bersimis conductor (snow zone) for lilo of existing m/s jsw 400 kv d/c baspa 2 to karcham wangtoo-jhakri tl at t-4 to evacuate power from shongtong hep
Read moreof your Industry type