🚂 Procurement Opportunity: Breather Assembly For Wdg 4 Locomotives 🛠️ The Ministry Of Railways, Central Government, Invites Bids For The Supply Of Breather Assembly To Crank Case To Emd Part No 8271512, Specifically For Wdg 4 Locomotives. 🚂 📅 Bid Submission Deadline: April 05, 2024, 1:30 Pm Interested Bidders Are Requested To Refer To The Tender Document For Complete Details And Specifications. Bids Should Be Submitted In Accordance With The Tender Guidelines And Adhere To The Prescribed Format. Keywords: Breather Assembly, Crank Case, Emd Part No 8271512, Wdg 4 Locomotives, Ministry Of Railways, Government Tender, Procurement| Particulars | Details |
|---|---|
| Title |
Hexagonal Head Bolt With Nut M12x50mm.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106294381 |
|
Reference Number |
73241010A |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/012025/106558676/viewNitPdf_4811099.pdf |
| Start Date | December 19, 2024 21:19 |
| End Date |
Expired
18/01/2025
Expired 616 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreSupply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreHiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Read moreProviding of external electrification with under ground cable system to the approved hmda layout in sy.no.239, 240, 247,249 of bahadurpally(v), dundigal gandimaisamma(m), medchal-malkajgiri(dist).
Providing of external electrification with under ground cable system to the approved hmda layout in sy.no.239, 240, 247,249 of bahadurpally(v), dundigal gandimaisamma(m), medchal-malkajgiri(dist).
Read moreDesign, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type