Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Transportation And Installation Of 276 Meter 1000mm Belt Structure With Belting And Two Times Transportation And Installation Of Tail End Unit Along 85 L From 13 D To 20 D In R Viia Seam Of 3 N4 Incline, Jhanjra Project Colliery
|
Description |
Transportation And Installation Of 276 Meter 1000mm Belt Structure With Belting And Two Times Transportation And Installation Of Tail End Unit Along 85 L From 13 D To 20 D In R Viia Seam Of 3 N4 Incline, Jhanjra Project Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_329184_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/145 dated 12.02.2025 |
Tender Fee | 0 |
EMD | 19100 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341203 |
Start Date | February 18, 2025 16:30 |
End Date |
28/02/2025 ( Expired 118 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Contractual work of transport and installation of 06 nos drive heads including structure, belting and tail-end installation for establishment of w7b panel in ug at chhatarpur mine no.1 of pathakhera area.
Contractual work of transport and installation of 06 nos drive heads including structure, belting and tail-end installation for establishment of w7b panel in ug at chhatarpur mine no.1 of pathakhera area.
Read moreTransportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam
Transportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam
Read moreStrengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Strengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Read moreInstallation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Installation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Read moreTransportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Transportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Read moreTransportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.
Transportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.
Read moreRe organization of track line by installation of track line contractually from 9l to 24l along with contractual supply of dog nail nut bolt and fish plate by laying transportation and fitting of chora block incline colliery under kenda area ecl
Re organization of track line by installation of track line contractually from 9l to 24l along with contractual supply of dog nail nut bolt and fish plate by laying transportation and fitting of chora block incline colliery under kenda area ecltr
Read moreEstablishment of drainage system along 19xd and 20xd in rvii seam at 3 and 4 incline unit of jhanjra project colliery
Establishment of drainage system along 19xd and 20xd in rvii seam at 3 and 4 incline unit of jhanjra project colliery
Read moreInstallation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.
Installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 sect
Read moreRegular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Read moreof your Industry type