Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Transportation Installation Of 310.5mtr 1000mm Belt Structure With Belting And Nine Times Transportation Installation Of Tail End Unit At 80 L Tandem Belt Conveyor In Panel 9, R Viia Seam Of 3n4 Incline
|
Description |
Transportation Installation Of 310.5mtr 1000mm Belt Structure With Belting And Nine Times Transportation Installation Of Tail End Unit At 80 L Tandem Belt Conveyor In Panel 9, R Viia Seam Of 3n4 Incline
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_ECL_291549_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/23-24/40 DATED 17-10-2023 |
Tender Fee | |
EMD | 14000 |
Tender Value | |
Place | Online |
Link | https://coalindiatenders.nic.in |
Start Date | October 19, 2023 16:30 |
End Date |
03/11/2023 ( Expired 606 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Making of 110 nos subsidence pillars and making of garland drain over depillaring panel no.8 and 9 in seam 8a2 of 7/8 incline at rajnagar ro colliery of hasdeo area.
Making of 110 nos subsidence pillars and making of garland drain over depillaring panel no.8 and 9 in seam 8a2 of 7/8 incline at rajnagar ro colliery of hasdeo area.
Read moreRepairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Repairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Read moreContractual work of transport and installation of 06 nos drive heads including structure, belting and tail-end installation for establishment of w7b panel in ug at chhatarpur mine no.1 of pathakhera area.
Contractual work of transport and installation of 06 nos drive heads including structure, belting and tail-end installation for establishment of w7b panel in ug at chhatarpur mine no.1 of pathakhera area.
Read moreInstallation of eleven reels 2200 mtr 1000mm belt of lhcm-2 belt conveyors running at 3n4 incline unit, j.p.colly.
Installation of eleven reels 2200 mtr 1000mm belt of lhcm-2 belt conveyors running at 3n4 incline unit, j.p.colly.
Read moreTransportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam
Transportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam
Read moreExtension of 1000mm belt in underground at cm panel w7xcut proposed development panel of bagdona coal seam at tawa mine of wcl, pathakhera area.
Extension of 1000mm belt in underground at cm panel w7xcut proposed development panel of bagdona coal seam at tawa mine of wcl, pathakhera area.
Read moreContractual work of transport and installation of a pony belt including structure, belting and tailend installation w5a panel in ug at chhatarpur mine no. 1 of pathakhera area.
Contractual work of transport and installation of a pony belt including structure, belting and tailend installation w5a panel in ug at chhatarpur mine no. 1 of pathakhera area.
Read moreTransportation, installation and commissioning of 5 stage 1000 gpm centrifugal pump with power setup and water delivery range to surface in rvi seam of cm project at nkd-kum cm colliery bankola area
Transportation, installation and commissioning of 5 stage 1000 gpm centrifugal pump with power setup and water delivery range to surface in rvi seam of cm project at nkd-kum cm colliery bankola area
Read moreComplete repairing and overhauling of a)popular shaft of 58 screen and coupling of 79 belt conveyor b)bearing block with bearing in take-up drum (left and right side) of unit no. 66 and 79 belt conveyor in raw coal section at kathara washery
Complete repairing and overhauling of a)popular shaft of 58 screen and coupling of 79 belt conveyor b)bearing block with bearing in take-up drum (left and right side) of unit no. 66 and 79 belt conveyor in raw coal section at kathara washery
Read moreReplacement of 1400mm wide conveyor belt in unit 502, 105, 201 n 1000mm wide belt conveyor in unit 801-a and replacement of damaged conveyor belting pieces at different belt conveyors under section-v (as and when required) at moonidih coal washery.
Replacement of 1400mm wide conveyor belt in unit 502, 105, 201 n 1000mm wide belt conveyor in unit 801-a and replacement of damaged conveyor belting pieces at different belt conveyors under section-v (as and when required) at moonidih coal washery.
Read moreof your Industry type