Tender Details
Particulars | Details |
---|---|
Title |
Transportation Installation Of 310.5mtr 1000mm Belt Structure With Belting And Nine Times Transportation Installation Of Tail End Unit At 80 L Tandem Belt Conveyor In Panel 9, R Viia Seam Of 3n4 Incline
|
Description |
Transportation Installation Of 310.5mtr 1000mm Belt Structure With Belting And Nine Times Transportation Installation Of Tail End Unit At 80 L Tandem Belt Conveyor In Panel 9, R Viia Seam Of 3n4 Incline
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_ECL_291549_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/23-24/40 DATED 17-10-2023 |
Tender Fee | |
EMD | 14000 |
Tender Value | |
Place | Online |
Link | https://coalindiatenders.nic.in |
Start Date | October 19, 2023 16:30 |
End Date |
03/11/2023 ( Expired 560 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Transportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Read moreThe work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd
The work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd
Read moreDesign commissioning testing, supply installation of a solar submersible pump with all necessary accessories, including solar pv modules, pump modules, pump motor set, solar panel mounting structure, control unit etc complete job at goma parakachick
Design commissioning testing, supply installation of a solar submersible pump with all necessary accessories, including solar pv modules, pump modules, pump motor set, solar panel mounting structure, control unit etc complete job at goma parakachick
Read moreInstallation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.
Installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 sect
Read moreRegular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Read moreTransportation, installation, necessary fabrication, commissioning trial including extension of one no. 1000mm width, 1x90kw, 550v, single drive belt conveyor along 64l from 8d to 10d in r-vii seam at 3n4 incline, j.p. colly.
Transportation, installation, necessary fabrication, commissioning trial including extension of one no. 1000mm width, 1x90kw, 550v, single drive belt conveyor along 64l from 8d to 10d in r-vii seam at 3n4 incline, j.p. colly.
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreNew installation of belt conveyor at b19c panel in rvi seam for shcm in khottadih colliery pandaveswar area.
New installation of belt conveyor at b19c panel in rvi seam for shcm in khottadih colliery pandaveswar area.
Read moreUpkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreof your Industry type