Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
S/E Of Cctv Cameras On Diff. Sites Of City
|
| Description |
S/E Of Cctv Cameras On Diff. Sites Of City
|
| Organisation | Government of Punjab |
| Tender Id | 2023_DLG_106860_1 |
|
Reference Number |
01/FGP |
| Tender Fee | 1000 |
| EMD | 56180 |
| Tender Value | - |
| Place | FATEHGARH PANJTOOR |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in |
| Start Date | August 05, 2023 00:25 |
| End Date |
Expired
21/08/2023
Expired 1129 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreConstruction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Read moreSupply, erection, testing and commissioning of (i) erection of 220kv dc line(37km) from 220/132kv ss sadashivpet to m/s. zaheerabad nimz ltd.(ii) 2nos 220kv bay extensions at 220/132kv ss sadhashivpet and (iii) 2nos 220kv bay extensions and 1no. metering bay at m/s. zaheerabad nimz ltd on turnkey basis.
Supply, erection, testing and commissioning of (i) erection of 220kv dc line(37km) from 220/132kv ss sadashivpet to m/s. zaheerabad nimz ltd.(ii) 2nos 220kv bay extensions at 220/132kv ss sadhashivpet and (iii) 2nos 220kv bay extensions and 1no. metering bay at m/s. zaheerabad nimz ltd on turnkey basis.
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreLaying of bt road on fateh nagar flyover main road in fateh nagar ward 260,bowenpally circle-03,mmc(2nd call)(item no.3)
Laying of bt road on fateh nagar flyover main road in fateh nagar ward 260,bowenpally circle-03,mmc(2nd call)(item no.3)
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreProposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Proposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Read moreof your Industry type