Tender Details

Particulars Details
Title
Deposit Deposit Works Ky Ip 2024 25 Construction Of Canal Bund Road Between Ch 0/300 Km And 0/400 Km Of Pallikkara Field Bothie Canal (Pallikkara Central L.P Canal Mukku Vattakuni Thazha Road ) In Tikkodi Grama Panchayath Phase 1 General Civil Work
Description
Ky Ip 2024 25 Construction Of Canal Bund Road Between Ch 0/300 Km And 0/400 Km Of Pallikkara Field Bothie Canal (Pallikkara Central L.P Canal Mukku Vattakuni Thazha Road ) In Tikkodi Grama Panchayath Phase 1 General Civil Work
Organisation Irrigation Department | State Govt. and UT
Tender Id 2025_Irrig_749060_1
Reference
Number
IRR/PI/TR/5274/2023_5_6_5/1
Tender Fee 840
EMD 9484
Tender Value
Place Pallikkara Central
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1222035
Start Date March 21, 2025 00:25
End Date

27/03/2025 ( Expired 25 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
General wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km

General wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km

Read more
General-wp- cada (2024-2025) modernization of field channal offtakes fromthe ch 0-330 km (lhs) of koundan canal in between ch 0-250 km to 0-750 km

General-wp- cada (2024-2025) modernization of field channal offtakes fromthe ch 0-330 km (lhs) of koundan canal in between ch 0-250 km to 0-750 km

Read more
General rm 2024 25 rc 2 phase 2 zone 1 having 11.65 km road length, one year running contract for various 2 road streches under ezhukone roads section in kollam district moorthikavu manakkarakavu road ch 0 000 to 5 200 5.2km neduvathur puthur road

General rm 2024 25 rc 2 phase 2 zone 1 having 11.65 km road length, one year running contract for various 2 road streches under ezhukone roads section in kollam district moorthikavu manakkarakavu road ch 0 000 to 5 200 5.2km neduvathur puthur road

Read more
Lac-ads-lac - ads works-construction of box culvert at nettissery branch canal ch. 0/300 km-general civil work

Lac-ads-lac - ads works-construction of&amp#x0d box culvert at nettissery branch canal ch.&amp#x0d 0/300 km-general civil work

Read more
Deposit-deposit works-kyip 2024-25 (thodannur block panchayat deposit work) construction of bridge across puthuppanam distributary canal near ch 1/500km (karyattu thazha canal palam) in maniyur grama panchayat-general civil work

Kyip 2024-25 (thodannur block panchayat deposit work) construction of bridge across puthuppanam distributary canal near ch 1/500km (karyattu thazha canal palam) in maniyur grama panchayat

Read more
General wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work

General wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work

Read more
General budget work 2024 25 20precentage overlay with bc 1.100 km improvements to bsnl road in varkala town roads using bc overlay and allied works from ch 0 000 to 1 100-general civil work

General budget work 2024 25 20precentage overlay with bc 1.100 km improvements to bsnl road in varkala town roads using bc overlay and allied works from ch 0 000 to 1 100-general civil work

Read more
General budget works 2022 23 drainage works in kutty sahib road providing drainage facilities in kutty sahib road in between ch 0 400 and 0 700 re arranged work general civil work

General budget works 2022 23 drainage works in kutty sahib road providing drainage facilities in kutty sahib road in between ch 0 400 and 0 700 re arranged work general civil work

Read more
General wp cada 2024 2025 modernization of field channel offtakes from ch 02 500 km of chalai lbc canal in between ch 0 000km to 0 350 km 1408 2024 general civil work

General wp cada 2024 2025 modernization of field channel offtakes from ch 02 500 km of chalai lbc canal in between ch 0 000km to 0 350 km 1408 2024 general civil work

Read more
Deposit-kyip 2023-24-construction of mampoyil ulliyeri south canal road in ulliyeri grama panchayath(canal inspection road between ch. 2/108 km and ch. 2/235 km of narath distributory)-general civil work

Deposit-kyip 2023-24-construction of&amp#x0d mampoyil ulliyeri south canal road in ulliyeri&amp#x0d grama panchayath(canal inspection road&amp#x0d between ch. 2/108 km and ch. 2/235 km of&amp#x0d narath distributory)-general civil work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise