Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Construction Of Compound Wall Of Substation And Quarters Compound In Connection With Development Of Nh 66.
|
| Description |
Capital Work At 220 Kv Substation, Punnapra Re Construction Of Compound Wall Of Substation And Quarters Compound In Connection With Development Of Nh 66.
|
| Organisation | Kerala State Electricity Board | State Govt. and UT |
| Tender Id | 2024_KSEB_686821_1 |
|
Reference Number |
2/SSSD PRA/24-25/19.08.2024 |
| Tender Fee | 5900 |
| EMD | 50000 |
| Tender Value | |
| Place | PUNNAPRA |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1068724 |
| Start Date | August 25, 2024 15:30 |
| End Date |
Expired
13/09/2024
Expired 648 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of compound wall and tin shed at ward no.27
Construction of compound wall and tin shed at ward no.27
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConstruction of boundary wall and development of lawn
Construction of boundary wall and development of lawn at zirconium complex township, pazhayakayal, tuticorin - 628152
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreImmediate rectification and re-design of drainage and yard protection works at 765 kv sikar-ii substation
Immediate rectification and re-design of drainage and yard protection works at 765 kv sikar-ii substation
Read moreRe-construction of damaged footpath with interlocking paver blocks around park in sector 38-c, chandigarh (wdf).
Re-construction of damaged footpath with interlocking paver blocks around park in sector 38-c, chandigarh (wdf).
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreLand development works and construction of precast boundary wall for setting up of cbg plant for bpcl at rajnandgaon, chhattisgarh
Land development works and construction of precast boundary wall for setting up of cbg plant for bpcl at rajnandgaon, chhattisgarh
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreRe-construction of damaged footpath and kerbs on v-4 road in sector 37 chandigarh.
Re-construction of damaged footpath and kerbs on v-4 road in sector 37 chandigarh.
Read moreof your Industry type