Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nie T20/Ee/Med/Gta/2023 24
|
| Description |
Construction Of Paver Block Pathway From Dam To Indreni Bridge At Mirik Lake, Gta
|
| Organisation | GORKHALAND TERRITORIAL ADMINISTRATION | State Govt. and UT |
| Tender Id | 2024_GTA_680160_1 |
|
Reference Number |
NieT20/EE/MED/GTA/2023-24 |
| Tender Fee | 0 |
| EMD | 1.03 Lakh |
| Tender Value | - |
| Place | Mirik |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1480167 |
| Start Date | March 05, 2024 23:30 |
| End Date |
Expired
19/03/2024
Expired 920 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreNiet20 /ee/kid/gta/2023-24
Proper drainage system for protection of areas at hill top near krishna sherpas house ward noxxi in ps kalimpong e no 610126
Read moreNiet20/ee/med/gta/2024-25(3rd call of niet16/iv)
Up gradation of road from panch number creche house to purano school dara,okaity tea estate, mirik (l-1010.00 m).
Read moreNiet17/ee/med/gta/2023-24
Land development and protection work at soureni phc under mirik block, of darjeeling gta.
Read moreNiet19/ee/med/gta/2023-24
Construction of sedimentation tank and water supply line to rangbhang swimming pond, ranbhang
Read moreNiet12/ee/med/gta/2023-24
Repair of the road from bhupen subba house tosashi bhusan house, ward no.8 under mirik municipality
Read moreNiet12/ee/med/gta/2023-24
Repair for the road from ningalay fatak to okaity simana via ningalay dara gaon and ningalay srilanka gaon.
Read moreNiet11/ee/med/gta/2023-24
Construction of new gram panchayat office at paila gaon school dara under mirik block, district darjeeling
Read moreof your Industry type