Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Air Lock Double Door Ventilation Stopping With Mild Steel Door To The Provided At 11th East Level In Between Travelling Roadway Of Newly Started District In Sawang C Seam Working 7 And 8 Incl. Of Govindpur Ug Project Under Govindpur
|
| Description |
Construction Of Air Lock Double Door Ventilation Stopping With Mild Steel Door To The Provided At 11th East Level In Between Travelling Roadway Of Newly Started District In Sawang C Seam Working 7 And 8 Incl. Of Govindpur Ug Project Under Govindpur
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_282616_1 |
|
Reference Number |
PO/PE(C)/GVP U/G/E-Tender/23-24/07 dt- 30.06.2023 |
| Tender Fee | - |
| EMD | 800 |
| Tender Value | - |
| Place | Office of the Project Officer,Govindpur UG Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | July 01, 2023 15:30 |
| End Date |
Expired
14/07/2023
Expired 1192 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction one ventilation stopping with door and plastering with hollering 19 nos old ventilation stoppings in s p combined seam under kumardhubi colliery.
Construction one ventilation stopping with door and plastering with hollering 19 nos old ventilation stoppings in s p combined seam under kumardhubi colliery.
Read moreConstruction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways in jamuna 9/10 mine.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways in jamuna 9/10 mine.
Read moreConstruction of new 04 nos. ventilation stopping fitted with 02(two) nos. door in underground of methani colliery
Construction of new 04 nos. ventilation stopping fitted with 02(two) nos. door in underground of methani colliery
Read moreConstruction of 40 nos. brick pillars along travelling roadway and haulage roadway of stowing panel s-1, 50d/52l dev. district and the inspection route of isolation stopping against caved out panel- f in narsamuda (r-x) seam working at narsamuda coll
Construction of 40 nos. brick pillars along travelling roadway and haulage roadway of stowing panel s-1, 50d/52l dev. district and the inspection route of isolation stopping against caved out panel- f in narsamuda (r-x) seam working at narsamuda coll
Read moreProposal for repairing of 10 nos. ventilation stopping along roof heightening gallery between 2d and 3d and roof heightening of gallery in travelling roadway from 72l/2d to 73l/2d ,82l/2d to 85l/2d ,91l/2d to 101l/2d, 102/2d to 115l/2d of masan combi
Proposal for repairing of 10 nos. ventilation stopping along roof heightening gallery between 2d and 3d and roof heightening of gallery in travelling roadway from 72l/2d to 73l/2d ,82l/2d to 85l/2d ,91l/2d to 101l/2d, 102/2d to 115l/2d of masan combi
Read more(i) erection of temporary stopping by old reject conveyor belt in -21rise lhcm panel (ii) cleaning and removal of malma along travelling roadway of -21rise panel (iii) transportation, laying, charging of armored cable from old dist. to new dist.
(i) erection of temporary stopping by old reject conveyor belt in -21rise lhcm panel (ii) cleaning and removal of malma along travelling roadway of -21rise panel (iii) transportation, laying, charging of armored cable from old dist. to new dist.
Read more(i) erection of temporary stopping by old reject conveyor belt in -39dip and 28ls lhcm panel (ii) cleaning , removal of malma along travelling roadway of -39dip and 28ls panel (iii) transportation, laying, charging of armored cable from old dist. to
(i) erection of temporary stopping by old reject conveyor belt in -39dip and 28ls lhcm panel (ii) cleaning , removal of malma along travelling roadway of -39dip and 28ls panel (iii) transportation, laying, charging of armored cable from old dist. to
Read moreRepairing seven (07) nos ventilation stopping at 34l to 37l/0d-1ed, 1ed/37l-38l (double door) 2ed/37l- 38l in r-v seam of khottadih colliery, pandaveswar area.
Repairing seven (07) nos ventilation stopping at 34l to 37l/0d-1ed, 1ed/37l-38l (double door) 2ed/37l- 38l in r-v seam of khottadih colliery, pandaveswar area.
Read moreConstruction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreof your Industry type