Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 20 (Twenty) Nos. New Ventilation Stopping And 02 Nos. Ventilation Double Door Between Intake And Airways In Jamuna 9/10 Mine.
|
Description |
Construction Of 20 (Twenty) Nos. New Ventilation Stopping And 02 Nos. Ventilation Double Door Between Intake And Airways In Jamuna 9/10 Mine.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_337161_1 |
Reference Number |
SECL/JK/GM(O)/25-26/eT/16 Date 07.06.2025 |
Tender Fee | 0 |
EMD | 21500 |
Tender Value | |
Place | Jamuna 9/10 Mine, Bhadra Sub Area, JK Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349525 |
Start Date | June 09, 2025 23:30 |
End Date |
19/06/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Read moreConstruction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)
Construction of 4 new foot over bridges in&#x0d indore on design, built, operate and transfer&#x0d basis and maintenance of existing three fobs&#x0d for license period of 10 years (extendable to&#x0d five years)
Read moreConstruction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)
Construction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect&#x0d phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)&#x0d
Read moreConstruction of new embankment and 4 lane road between shaheed path and kisan path on rhs bank of gomti river in lucknow, in the state of uttar pradesh
Construction of new embankment and 4 lane road between shaheed path and kisan path on rhs bank of gomti river in lucknow, in the state of uttar pradesh
Read moreHiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Hiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Read moreConstruction of cc drain from door no. 19-9-22/b (subodhaya hospital to kola mansion at jaya naga and at koramenugunta areas in ward no. 3. 15th fc-2023-24 (ist installment) untied grant. (2nd call).
Construction of cc drain from door no. 19-9-22/b (subodhaya hospital to kola mansion at jaya naga and at koramenugunta areas in ward no. 3. 15th fc-2023-24 (ist installment) untied grant (2nd call).
Read moreConstruction of cc drain from d.no. 20-5-304 to 20-5-308/a and d.no. 20-5-319/a to 20-5-329 sachivalyam street in sanjay gandhi colony ward no. 9. 15th fc -2023-24 (ist installment) untied grant. (2nd call).
Construction of cc drain from d.no. 20-5-304 to 20-5-308/a and d.no. 20-5-319/a to 20-5-329 sachivalyam street in sanjay gandhi colony ward no. 9. 15th fc -2023-24 (ist installment) untied grant (2nd call).
Read moreConstruction of girls toilet in 29 (twenty-nine) nos for primary schools and 2 (two) for secondary schools under education(s) and ta and hills in respect of kangpokpi district, manipur.
Construction of girls toilet in 29 (twenty-nine) nos for primary schools and 2 (two) for secondary schools under education(s) and ta and hills in respect of kangpokpi district, manipur.
Read moreConstruction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Read moreGsss kundil gmssss beeswanmile ggsss datauli gsss barota construction of 8 nos class room in ggsss datauli construction of phy, chem,bio lab in gsss batota 8 no. class rooms with veranda and staircase 12 no. new class room
Gsss kundil gmssss beeswanmile ggsss datauli gsss barota&#x0d construction of 8 nos class room in ggsss datauli construction of phy, chem,bio lab in gsss batota 8 no. class rooms with veranda and staircase 12 no. new class room
Read moreof your Industry type