Tender Details

Particulars Details
Title
Shifting And Re Installation Of Slope Stability Radar (Ssr) Of Gevra Project On As And When Required Basis For A Period Of 02 Years.
Description
Shifting And Re Installation Of Slope Stability Radar (Ssr) Of Gevra Project On As And When Required Basis For A Period Of 02 Years.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_325070_1
Reference
Number
SECL/GA/SOENM/ 24-25/E-TENDER/151 Dt. 06/01/2025
Tender Fee 0
EMD 3300
Tender Value -
Place Gevra Project
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336957

Start Date January 09, 2025 15:30
End Date
Expired 21/01/2025

Expired 631 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repairing of barbed wire and concertina coil fencing (as and when required) at m. s. siding under j. k. nagar (r) mines satgram-sripur area (re-tender)

Repairing of barbed wire and concertina coil fencing (as and when required) at m. s. siding under j. k. nagar (r) mines satgram-sripur area (re-tender)

Read more
Custom bid for services - hiring of services for repair of gas compressors located at ongc uran plant on as and when required basis for a period of three years

Custom bid for services - hiring of services for repair of gas compressors located at ongc uran plant on as and when required basis for a period of three years

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Read more
Supply installation and commissioning and camc of 7 years after completion of 1 year warranty of mine slope stability monitoring radar system

Supply installation and commissioning and camc of 7 years after completion of 1 year warranty of mine slope stability monitoring radar system

Read more
Supply installation and commissioning and camc of 7 years after completion of 1 year warranty of mine slope stability monitoring radar system

Supply installation and commissioning and camc of 7 years after completion of 1 year warranty of mine slope stability monitoring radar system

Read more
Supply, installation, commissioning and training for 5 nos. mine slope stability monitoring radar system with 1 year warranty and 7 years comprehensive annual maintenance contract after warranty period

Supply, installation, commissioning and training for 5 nos. mine slope stability monitoring radar system with 1 year warranty and 7 years comprehensive annual maintenance contract after warranty period

Read more
Supply, installation, commissioning and training for 5 nos. mine slope stability monitoring radar system with 1 year warranty and 7 years comprehensive annual maintenance contract after warranty period

Supply, installation, commissioning and training for 5 nos. mine slope stability monitoring radar system with 1 year warranty and 7 years comprehensive annual maintenance contract after warranty period

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise