Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting And Re Installation Of Slope Stability Radar (Ssr) Of Gevra Project On As And When Required Basis For A Period Of 02 Years.
|
| Description |
Shifting And Re Installation Of Slope Stability Radar (Ssr) Of Gevra Project On As And When Required Basis For A Period Of 02 Years.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_325070_1 |
|
Reference Number |
SECL/GA/SOENM/ 24-25/E-TENDER/151 Dt. 06/01/2025 |
| Tender Fee | 0 |
| EMD | 3300 |
| Tender Value | - |
| Place | Gevra Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336957 |
| Start Date | January 09, 2025 15:30 |
| End Date |
Expired
21/01/2025
Expired 631 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of barbed wire and concertina coil fencing (as and when required) at m. s. siding under j. k. nagar (r) mines satgram-sripur area (re-tender)
Repairing of barbed wire and concertina coil fencing (as and when required) at m. s. siding under j. k. nagar (r) mines satgram-sripur area (re-tender)
Read moreCustom bid for services - hiring of services for repair of gas compressors located at ongc uran plant on as and when required basis for a period of three years
Custom bid for services - hiring of services for repair of gas compressors located at ongc uran plant on as and when required basis for a period of three years
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreProcurement of 3 nos. slope stability monitoring radar (ssr) system with accessories and camc
Read more
Pre-nit for supply, installation & commissioning of of mine slope stability monitoring radar system
Read more
Mine slope stability monitoring radar system (range atleast 2.5km) with 1y warranty & 7y camc,mine
Read more
Supply installation and commissioning and camc of 7 years after completion of 1 year warranty of mine slope stability monitoring radar system
Supply installation and commissioning and camc of 7 years after completion of 1 year warranty of mine slope stability monitoring radar system
Read moreSupply installation and commissioning and camc of 7 years after completion of 1 year warranty of mine slope stability monitoring radar system
Supply installation and commissioning and camc of 7 years after completion of 1 year warranty of mine slope stability monitoring radar system
Read moreSupply, installation, commissioning and training for 5 nos. mine slope stability monitoring radar system with 1 year warranty and 7 years comprehensive annual maintenance contract after warranty period
Supply, installation, commissioning and training for 5 nos. mine slope stability monitoring radar system with 1 year warranty and 7 years comprehensive annual maintenance contract after warranty period
Read moreSupply, installation, commissioning and training for 5 nos. mine slope stability monitoring radar system with 1 year warranty and 7 years comprehensive annual maintenance contract after warranty period
Supply, installation, commissioning and training for 5 nos. mine slope stability monitoring radar system with 1 year warranty and 7 years comprehensive annual maintenance contract after warranty period
Read moreof your Industry type