Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Invitation For Bids: Sulthan Canal Reconstruction 🛠️ The Irrigation Department Of The State Government And Union Territories Invites Bids From Experienced Contractors For The General Civil Work Involved In The Reconstruction Of The Right Side Protection Of The Sultan Canal. 🌫️ 📍 Location: Vadikkal, Between Chainage (Ch) 0.300km And 0.460km On The North Side Of Vadikkal Road Bridge. 🗓️ Bid Submission Deadline: June 20, 2024, 6:00 Pm 💸 Tender Fee: Inr 5515 💵 Earnest Money Deposit (Emd): Inr 500,000 Interested Bidders Must Submit Detailed Proposals, Including A Comprehensive Work Plan, Cost Estimates, And Adherence To Environmental And Safety Regulations. Keywords: General Civil Work, Sulthan Canal, Reconstruction, Irrigation Department, Contractors, Tender, Bid, Vadikkal, Chainage, Emd, Tender Fee| Particulars | Details |
|---|---|
| Title |
G E N E R A L S U L T H A N C A N A L Reconstruction Of Right Side Protection Of Sulthan Canal Between Ch 0.300km And 0.460km On North Side Of Vadikkal Road Bridge General Civil Work
|
| Description |
G E N E R A L S U L T H A N C A N A L Reconstruction Of Right Side Protection Of Sulthan Canal Between Ch 0.300km And 0.460km On North Side Of Vadikkal Road Bridge General Civil Work&Amp#X0d
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_641572_1 |
|
Reference Number |
IRR/IA/TR/100/2022_5_9_8/1 |
| Tender Fee | 5515 |
| EMD | 50000 |
| Tender Value | - |
| Place | vadikkal |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1049218 |
| Start Date | June 07, 2024 23:30 |
| End Date |
Expired
20/06/2024
Expired 847 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Auction of silt situated between km. 3.800 to km. 8.100 (right bank) of utraula main canal.
Auction of silt situated between km. 3.800 to km. 8.100 (right bank) of utraula main canal.
Read moreAuction of silt situated between km. 0.000 to km. 3.700 (right bank) of utraula main canal.
Auction of silt situated between km. 0.000 to km. 3.700 (right bank) of utraula main canal.
Read moreConstruction rcc trough lining including resection of canal bank cluster of ichhapur minor, under upper indravati right canal division no-l, mukhiguda.
Construction rcc trough lining including resection of canal bank cluster of ichhapur minor, under upper indravati right canal division no-l, mukhiguda.
Read moreConstruction rcc trough lining including resection of canal bank of kalampur minor and kalampur sub minor-l and kalampursub minor-ii, under upper indravati right canal division no-i, mukhiguda.
Construction rcc trough lining including resection of canal bank of kalampur minor and kalampur sub minor-l and kalampursub minor-ii, under upper indravati right canal division no-i, mukhiguda.
Read moreImprovement to budhidhara minor including construction of rcc trough lining at vulnerable reaches from rd 2000 to 3200 m under right canal division no-l, mukhiguda of upper indravati project.
Improvement to budhidhara minor including construction of rcc trough lining at vulnerable reaches from rd 2000 to 3200 m under right canal division no-l, mukhiguda of upper indravati project.
Read moreConstruction of l/wall on both sides of canal flo gh mohd khanday upto gh rasool lone near n/h at zangam, under cdf fy 2026-27, panchayat halqa buran zangam b, block pattan
Construction of l/wall on both sides of canal flo gh mohd khanday upto gh rasool lone near n/h at zangam, under cdf fy 2026-27, panchayat halqa buran zangam b, block pattan
Read moreG e n e r a l - m p - k d r - a p - 2 0 2 6 - 2 7 - maintaining water distribution -2026-27 removal of blockage, garbages and debris for lb main canal from ch 20/200km to 31/600km, all its branches and sub canal-general civil work
Engaging hydraulic excavator, engaging man mazdoor and supplying and stacking earth filled bags
Read moreGeneral sulthan canal reconstruction of side protection of sulthan canal between ch 0.580km to 0.720km on right bank general civil work
General sulthan canal reconstruction of side protection of sulthan canal between ch 0.580km to 0.720km on right bank general civil work&#x0d
Read moreGeneral sulthan canal reconstruction of right bank side protection of sulthan canal on north and south side of chinaclay thodu for a length of 130.00m general civil work
General sulthan canal reconstruction of right bank side protection of sulthan canal on north and south side of chinaclay thodu for a length of 130.00m general civil work
Read morePvip-2025-26 -lining of canal between ch. 0.250km and ch.0.300km of ambunad md
Rectification works between ch.0.250 km and ch.0.300 km of ambunadu md
Read moreof your Industry type