Tender Details

Particulars Details
Title
Custom Bid For Services 200143711 Single Stage Post Operational Chemical Cleaning Of One 500 Mw B
Description
Organisation NA | Ministry of Power
Tender Id GEM/2025/B/6516590
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date August 01, 2025 16:18
End Date
Expired 12/08/2025

Expired 425 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years Project Experience Required: No
Buyer Name: Sukriti Dubey
Ministry: Ministry Of Power
Department: Na
Organisation: Ntpc Limited
Similar Tenders
Supply of various valves for tm division in 500 mw unit

Supply of various valves for tm division in 500 mw unit

Read more
Tggenco-ktps vii stage/paloncha - supply of different sizes of post mounted support insulators

Tggenco-ktps vii stage/paloncha - supply of different sizes of post mounted support insulators

Read more
Tggenco -ktps - vii stage - chemical div - procurement of quartz sand for ssf / avg filters at cwtp - quotation called for - regarding.

Tggenco -ktps - vii stage - chemical div - procurement of quartz sand for ssf / avg filters at cwtp - quotation called for - regarding.

Read more
Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage

Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage

Read more
Spares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit

Spares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit

Read more
Request for expression of interest for debt financing of rs. 7,197 crore for setting up of 1 x 800 mw super critical unit (stage-ii) at pegadapalli village, jaipur mandal, mancherial district - reg.

Request for expression of interest for debt financing of rs. 7,197 crore for setting up of 1 x 800 mw super critical unit (stage-ii) at pegadapalli village, jaipur mandal, mancherial district - reg.

Read more
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.

Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.

Read more
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Read more
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Read more
Single stage post operational chemical cleaning of 500 mw once through

Single stage post operational chemical cleaning of 500 mw once throughunit 1 boiler water circuit during overhauling at ntpc tstps kaniha

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise