Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services 200143711 Single Stage Post Operational Chemical Cleaning Of One 500 Mw B
|
| Description |
|
| Organisation | NA | Ministry of Power |
| Tender Id | GEM/2025/B/6516590 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 01, 2025 16:18 |
| End Date |
Expired
12/08/2025
Expired 425 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply of various valves for tm division in 500 mw unit
Supply of various valves for tm division in 500 mw unit
Read moreTggenco-ktps vii stage/paloncha - supply of different sizes of post mounted support insulators
Tggenco-ktps vii stage/paloncha - supply of different sizes of post mounted support insulators
Read moreTggenco -ktps - vii stage - chemical div - procurement of quartz sand for ssf / avg filters at cwtp - quotation called for - regarding.
Tggenco -ktps - vii stage - chemical div - procurement of quartz sand for ssf / avg filters at cwtp - quotation called for - regarding.
Read moreTggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage
Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage
Read moreSpares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit
Spares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit
Read moreRequest for expression of interest for debt financing of rs. 7,197 crore for setting up of 1 x 800 mw super critical unit (stage-ii) at pegadapalli village, jaipur mandal, mancherial district - reg.
Request for expression of interest for debt financing of rs. 7,197 crore for setting up of 1 x 800 mw super critical unit (stage-ii) at pegadapalli village, jaipur mandal, mancherial district - reg.
Read moreSelection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreSingle stage post operational chemical cleaning of 500 mw once through
Single stage post operational chemical cleaning of 500 mw once throughunit 1 boiler water circuit during overhauling at ntpc tstps kaniha
Read moreof your Industry type