Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Various Valves For Tm Division In 500 Mw Unit
|
| Description |
Supply Of Various Valves For Tm Division In 500 Mw Unit
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-CE KTPS V & VI STAGE |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 0 |
| Place | Telangana |
| Link | Login to view |
| Start Date | September 09, 2026 23:30 |
| End Date |
Closing soon
14/10/2026
0 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of spares for hpbp system valves of make bhel for stage iiunits at ntpc sipat 500 mw capacity
Procurement of spares for hpbp system valves of make bhel for stage iiunits at ntpc sipat 500 mw capacity
Read moreRenovation and modernization of stage 1 boiler motorised and manual high pressure valves 2 x 500 mw rihand super thermal power station
Renovation and modernization of stage 1 boiler motorised and manual high pressure valves 2 x 500 mw rihand super thermal power station
Read moreTggenco-ktps-vii stage -tm- procurement of consumables for high pressure valves
Tggenco-ktps-vii stage -tm- procurement of consumables for high pressure valves
Read moreProcurement of generator pt for 500 mw generator protection , metering, sync and davr system for unit no 5, 500 mw ,sgtps,mppgcl,birsinghpur.
Procurement of generator pt for 500 mw generator protection , metering, sync and davr system for unit no 5, 500 mw ,sgtps,mppgcl,birsinghpur.
Read moreProcurement of terminal bushing for 500 mw generator of ntpc korba
Procurement of terminal bushing for 500 mw generator of ntpc korba
Read moreProcurement of thrust bearing jet lubrication type(fk4e36) for 500 mw
Procurement of thrust bearing jet lubrication type(fk4e36) for 500 mwbfp, ntpc farakka
Read moreTtps mechii tm i unitiii inspection overhauling renewal of piston seals piston rod packings in hplp bypass valves spray valves actuators condenser butterfly valves actuators and steam line valves actuators for main turbine system feed water syst
Ttps mechii tm i unitiii inspection overhauling renewal of piston seals piston rod packings in hplp bypass valves spray valves actuators condenser butterfly valves actuators and steam line valves actuators for main turbine system feed water syst
Read moreTtps mechii tm i unitiii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during the forthcoming annual overhaul
Ttps mechii tm i unitiii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during the forthcoming annual overhaul
Read moreMtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems
Mtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems
Read moreTtps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Ttps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Read moreof your Industry type