Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbphed/Se/Ec/N Ie T 51/2023 24/2
|
| Description |
Restoration Of Existing D.I. Rising Main And Augmented Upvc Pipe Line Of Distribution System For Surface Based Ws Scheme At Bagdah Bongaon At North East Part....Under Barasat Division, Phe Dte
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2023_PHED_617989_2 |
|
Reference Number |
|
| Tender Fee | 0 |
| EMD | 7.95 Lakh |
| Tender Value | |
| Place | Bongaon Sub-Division |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1316063 |
| Start Date | December 08, 2023 23:30 |
| End Date |
Expired
11/01/2024
Expired 904 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Wbphed/se/ec/niet-51/2023-24/1
Withdrawing and relaying of existing d.i. rising main and restoration of damaged upvc pipe line of distribution system for surface based ws scheme at bagdah-bongaon at south west part.....under barasat division, phe dte
Read moreWbphed/ae/hq/enit_04/25-26_11
Operation,maintenance of distribution system and rising main pipeline ci,di,upvc of jougram w/s scheme under burdwan division, phe, dte,
Read moreCons. of rising line, pathway, surface drain, laying of di and upvc pipeline and restoration of fhtc at salkumarhat pwss under alipurduar division, phe dte.
Cons. of rising line, pathway, surface drain, laying of di and upvc pipeline and restoration of fhtc at salkumarhat pwss under alipurduar division, phe dte.
Read moreOperation maintenance of rising main delivery main pipe line ci di hdpe upvc f.h.t.c. with all related structure of birkarnar ws scheme within jhargram sub division under jhargram division phe dte from 01.07.2024 to 30.06.2025. 2nd call
Operation maintenance of rising main delivery main pipe line ci di hdpe upvc f.h.t.c. with all related structure of birkarnar ws scheme within jhargram sub division under jhargram division phe dte from 01.07.2024 to 30.06.2025. 2nd call
Read moreOperation maintenance of rising main delivery main pipe line ci di hdpe upvc with all related structure of lalgarh bamal mouza ws scheme bamal mouza within jhargram sub-division under jhargram division, phe dte. from 01.09.2025 to 30.04.2026
Operation maintenance of rising main delivery main pipe line ci di hdpe upvc with all related structure of lalgarh bamal mouza ws scheme bamal mouza within jhargram sub-division under jhargram division, phe dte. from 01.09.2025 to 30.04.2026
Read moreWbphed/se/ec/niet-19/2024-25
Ms,di pipeline crossing by adopting mini hdd for road crossing at different places including the cost of carrier pipe, all labours, materials....surface water based ws scheme of bongaon bagdah....barasat division, phe dte.(south west,north east part)
Read moreWbphed/ee/bd-i/niet25/23-24_3
Laying of upvc pipeline at damagedportion of distribution system and rising main pipe line (ci/di/upvc) of ramnachandpur zone-ii water supply scheme under berhampore division-i,phe dte.
Read moreGap filling of distribution line with di/ci/upvc pipe at nurpur wss under alipurduar division, phe dte.
Gap filling of distribution line with di/ci/upvc pipe at nurpur wss under alipurduar division, phe dte.
Read moreWbphed/se/ec/niet-77/2023-24
Ms pipeline crossing by adopting mini hdd for road crossing in diff.pwss hw site on diff.road incl.cost of carrierpipe,labours,materials tools.all complete for ws scheme of bongaon bagdah under barasat division,phe dte.(north east and south west part
Read moreOperation maintenance of rising main delivery main pipe line cidihdpeupvc with all related structure of tamajuri ws scheme within jhargram sub-division under jhargram division, phe dte. from 01.04.2024 to 31.03.2025
Operation maintenance of rising main delivery main pipe line cidihdpeupvc with all related structure of tamajuri ws scheme within jhargram sub-division under jhargram division, phe dte. from 01.04.2024 to 31.03.2025
Read moreof your Industry type