Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
01 Cleaning Of Surface Belt From Tail End Drum To Gear Box And Complete Changing Of Conveyor Belt Of Narsamuda Colliery. 02 Lowering Of
|
| Description |
01 Cleaning Of Surface Belt From Tail End Drum To Gear Box And Complete Changing Of Conveyor Belt Of Narsamuda Colliery. 02 Lowering Of
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_327685_1 |
|
Reference Number |
ECL/SDPA/AE(EnM)/e/24-25/1023 |
| Tender Fee | 0 |
| EMD | 7000 |
| Tender Value | |
| Place | Sodepur Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339639 |
| Start Date | February 01, 2025 20:30 |
| End Date |
Expired
10/02/2025
Expired 507 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of 02 nos tail end drum of c3 and c7 belt and 01 no discharge drum of c8 belt conveyor of bhatgaon chp
Repairing of 02 nos tail end drum of c3 and c7 belt and 01 no discharge drum of c8 belt conveyor of bhatgaon chp
Read moreDismantling, transportation and installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to new depillaring panel no. -6d,
Dismantling, transportation and installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to new depillaring panel no. -6d,
Read moreDismantling, transportation and installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to new depillaring panel no. 27d
Dismantling, transportation and installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to new depillaring panel no. 27d
Read moreDismantling, transportation and installation of 1000mm size drive drum, tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates, belt structure, belt conveyor and dismantling, transportation
Dismantling, transportation and installation of 1000mm size drive drum, tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates, belt structure, belt conveyor and dismantling, transportation
Read moreCleaning the debris along 10d from 19l to 26l tail end belt conveyor in r vii a seam at shyamsundarpur colliery
Cleaning the debris along 10d from 19l to 26l tail end belt conveyor in r vii a seam at shyamsundarpur colliery
Read moreCleaning of tb2 belt along main incline from tb1 tail end to 19l tail end of rviia seam at shyamsundarpur colliery.
Cleaning of tb2 belt along main incline from tb1 tail end to 19l tail end of rviia
 seam at shyamsundarpur colliery.
Read moreReplacement of out of order drive drum at 74al belt conveyor, gear box at 72l belt conveyor, tail end drum of 65 l belt conveyor, change of damaged belting at 65 l, 72 l, 74l in r-vii seam at lhcm2 section of 3n4 incline,jpc
Replacement of out of order drive drum at 74al belt conveyor, gear box at 72l belt conveyor, tail end drum of 65 l belt conveyor, change of damaged belting at 65 l, 72 l, 74l in r-vii seam at lhcm2 section of 3n4 incline,jpc
Read moreSalvaging of 535 mtr pvc belt and 02 nos load table (hopper) with 01 nos tail-end from rvii seam to surface at shyamsundarpur colliery under bankola area.
Salvaging of 535 mtr pvc belt and 02 nos load table (hopper) with 01 nos tail-end from rvii seam to surface at shyamsundarpur colliery under bankola area.
Read moreof your Industry type