Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pro. And Lay. Main Trunk Line And Const. Of Menhole Chambers From Ring Road Buddha Vihar To Senapati Nagar To Umred Road In P. No. 28
|
| Description |
Pro. And Lay. Main Trunk Line And Const. Of Menhole Chambers From Ring Road Buddha Vihar To Senapati Nagar To Umred Road In P. No. 28
|
| Organisation | Government of Maharashtra |
| Tender Id | 2024_NMCN_977587_1 |
|
Reference Number |
01-28/12/2023-EE Z-5 |
| Tender Fee | 590 |
| EMD | 21600 |
| Tender Value | |
| Place | Office of EE(Z5) ZO Om Nagar,Nandanvan,Nagpur |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | January 01, 2024 22:30 |
| End Date |
Expired
06/01/2024
Expired 904 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of odc road from new b and p chambers to main road
Construction of odc road from new b and p chambers to main road
Read moreDesilting of drain from amrit vihar to shalimar palace on main burari road and swaroop nagar road due to sand deposition into pwd drain by djb. (3rd call)
Desilting of drain from amrit vihar to shalimar palace on main burari road and swaroop nagar road due to sand deposition into pwd drain by djb. (3rd call)
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreProvn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Provn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Read moreProviding pipeline extn at anna nagar main road and vivekanandha street in ward no 14
Providing pipeline extn at anna nagar main road and vivekanandha street in ward no 14
Read moreProviding storm water drain and culvert at anna nagar main road (080017r257), anna nagar north road (080017r260) and vinayagar kovil road (080017r264) ward no 17 in palani municipality
Providing storm water drain and culvert at anna nagar main road (080017r257), anna nagar north road (080017r260) and vinayagar kovil road (080017r264) ward no 17 in palani municipality
Read moreProvn of floor tiling and other allied works in bldg no p-12 at ashok vihar and provn of hard standing and interlocking infront of a coy cook house and roof treatment of bldg no p-36, p-37 of 5071 asc bn and replacement of colour coated galvanium ste
Provn of floor tiling and other allied works in bldg no p-12 at ashok vihar and provn of hard standing and interlocking infront of a coy cook house and roof treatment of bldg no p-36, p-37 of 5071 asc bn and replacement of colour coated galvanium ste
Read moreCa no. ge af no.1 / gur-15 / 2026-27 periodical services by using smart periodical methodology and certain connected works in building common area, fire exit, garrages in building no p/144 to p/153 including mes complaint cell at sekhon vihar
Ca no. ge af no.1 / gur-15 / 2026-27 periodical services by using smart periodical methodology and certain connected works in building common area, fire exit, garrages in building no p/144 to p/153 including mes complaint cell at sekhon vihar
Read moreRepair maintenance of main water supply pipe line in south camp tech area new project trg area air enclave and prayag vihar and allied area at af stn bamrauli under ge af bamrauli
Repair maintenance of main water supply pipe line in south camp tech area new project trg area air enclave and prayag vihar and allied area at af stn bamrauli under ge af bamrauli
Read moreDevelopment of main road leading to sector 12 including main of lane 5 at hamdaniya colony bwo p/l of nallah muck/ khak bajri and wbm grade 2nd
Development of main road leading to sector 12 including main of lane 5 at hamdaniya colony bwo p/l of nallah muck/ khak bajri and wbm grade 2nd
Read moreof your Industry type