Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
E 10/25 26 Of Se, Om, Stage Ii, Dr.Mvr Rtpp
|
| Description |
Overhauling And Annual Maintenance Of 3 Phase, 6.6 Kv And 1.2 Kv Motors Of Em And Mrt, Stage Ii, Dr. M.V.R. Rtpp For The Year 2025 26
|
| Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
| Tender Id | 792206 |
|
Reference Number |
e-10/25-26 of SE, OM, Stage-II, Dr.MVR RTPP |
| Tender Fee | 502 |
| EMD | 21235 |
| Tender Value | |
| Place | AP |
| Link |
View Original Tender Notice
https://tender.apeprocurement.gov.in |
| Start Date | March 24, 2025 16:30 |
| End Date |
Expired
29/03/2025
Expired 478 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Augmentation of dry fly ash transportation system at barauni thermal power station, stage-ii (2x250 mw)
Augmentation of dry fly ash
 transportation system
 at
 barauni thermal power station, stage-ii
 (2x250 mw)
Read moreE-15/25-26 of se, om, stage-ii, dr.mvr rtpp
Overhauling of esps of unit-3 during annual overhaul period for the year 2025-26
Read moreE-16/25-26 of se, om, stage-ii, dr.mvr rtpp
Replacement of eroded and defective water wall and screen tubes, metal build up on eroded portions, providing of ss shrouds, rectification of cassette baffle plates and fin welding of pressure parts in unit-3 boiler during annual overhaul period for the year 2025-26
Read moreE-17/25-26 of se, om, stage-ii, dr.mvr rtpp
Replacement of eroded and defective economizer, ltsh, reheater coils, sh hanger tubes and sh side wall tubes, lowering/lifting of the coils, carrying out d-meter survey, erection and dismantling of temporary platforms and carrying out dp test on welded joints in unit-3 boiler during annual overhaul period for the year 2025-26
Read moreE-18/25-26 of se, om, stage-ii, dr.mvr rtpp
Clearing of ash below esp hoppers area, along and surroundings of the ash conveying pipe line from buffer hoppers to intermediate silos of stage-ii, dr. m.v.r. rtpp and loading it to the tractors and transporting to ash pond for a period from august 2025 to march 2026
Read moreE-05/24-25 of se/om/stage-ii/dr.mvr rtpp
Clearing of accumulated ash at bottom ash area, esp area, along and surroundings of the ash conveying pipe line from buffer hoppers to intermediate silos and along the ash conveying pipe line from intermediate silos to remote silos (except under the silos) of stage-ii and loading it to the tractors and transporting to ash pond for a period of one year (i.e. from april 24 to mar 25)
Read moreE-04/24-25 of se/om/stage-ii/dr.mvr rtpp
Disposal of mill rejects collected from unit-3,4 and 5 mills area to mill rejects yard including all leads, lifts and transportion charges in stage-ii and iii/dr.mvr rtpp for the year 2024-25
Read moreE-03/24-25 of se/om/stage-ii/dr.mvr rtpp
Overhauling and annual maintenance of 3-phase, 6.6 kv and 1.2kv motors of em and mrt, stage-ii, dr.mvr rtpp for the year 2024-25
Read moreE-13/24-25 of se, om, stage-ii, dr.mvr rtpp
Repair and rectification of 7 nos of bhel make 100 kva esp high voltage rectifier transformers at esps-3 and 4 of stage-ii, dr. m.v.r. rtpp
Read moreE-11/25-26 of se, om, stage-ii, dr.m.v.r. rtpp
Annual contract for overhauling of 2 nos cw pumps out of 06 nos existing cw pumps (make: bhel, model: cw1q, capacity: 15500 m3/hr, type: vertical pump, rpm: 490, suction discharge: 1600mm) available at cw pump house, cam, stage-ii, dr. m.v.r. rtpp for the year 2025-26
Read moreof your Industry type