Tender Details
Particulars | Details |
---|---|
Title |
Job 1 Restoration Of Rain Damaged On Link Road To Village Lamlehra From Jankaur 0 0 To 4 040. Sub Head Fc, C.O Retaining Wall, Breast Wall And P.L C.C Pavement In Approaches Km 0 070 To 0 110
|
Description |
Job 1 Restoration Of Rain Damaged On Link Road To Village Lamlehra From Jankaur 0 0 To 4 040. Sub Head Fc, C.O Retaining Wall, Breast Wall And P.L C.C Pavement In Approaches Km 0 070 To 0 110
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_87639_1 |
Reference Number |
Job 1 Restoration of rain damaged on link road to Village Lamlehra from Jankaur 0-0 to 4-040. Sub He |
Tender Fee | 500 |
EMD | 25500 |
Tender Value | |
Place | Una |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=130185 |
Start Date | March 02, 2024 15:30 |
End Date |
07/03/2024 ( Expired 413 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Restoration of rain damages on link road from amroh to baldook via banal basti km 0/00 to 4/555, link road madetar t-03 to manjhot road km 0/00 to 7/00, link road jolsappar to village har holwin km 0/00 to 2/00, link road to village jaskot km 0/00
Repair of pot holes in between km 0/00 to 4/555, 0/0 to 2/00 ,4/00 to 7/00, 0/00 to 2/00, 0/00 to 2/00 respectively)
Read moreFdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreRestoration of rain damages on dughilug to dubkan road km 0/00 to 4/570 (sh construction of wire crated r/ wall at rd 1/940 to 1/960).
Restoration of rain damages on dughilug to dubkan road km 0/00 to 4/570 (sh construction of wire crated r/ wall at rd 1/940 to 1/960).
Read moreR.r damages on link road chaura to chhota kamba road km 0.00 to 16.00 sub head- c.o r.wall at r.d. 2.390 to 2.402.60, 7.430 to 7.445, 12.595 to 12.603.80 and 12.820 to 12.832.10.
R.r damages on link road chaura to chhota kamba road km 0.00 to 16.00 sub head- c.o r.wall at r.d. 2.390 to 2.402.60, 7.430 to 7.445, 12.595 to 12.603.80 and 12.820 to 12.832.10.
Read moreR.r damages on link road to village kundli road in km 0/00 to 1/200 c.o r.wall at rd 0/090 to 0/102
R.r damages on link road to village kundli road in km 0/00 to 1/200 c.o r.wall at rd 0/090 to 0/102
Read moreUpgradation of link road from barring to tibok, othang and yangthang km. 0/00 to 9/215 under nabard-ridf-xxx sh rofd, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, wire crate and sign board etc.
Upgradation of link road from barring to tibok, othang and yangthang km. 0/00 to 9/215 under nabard-ridf-xxx sh rofd, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, wire crate and sign board etc.
Read moreRestoration of rain damages on dughilug to dubkan road km 0/00 to 4/570 (sh construction of wire crated r/ wall at rd 1/940 to 1/960).
Restoration of rain damages on dughilug to dubkan road km 0/00 to 4/570 (sh construction of wire crated r/ wall at rd 1/940 to 1/960).
Read moreRestoration of rain damages on dughilug to dupkan road km 0/00 to 4/570 (sh construction of wire crated r/ wall at rd 2/750 to 2/790).
Restoration of rain damages on dughilug to dupkan road km 0/00 to 4/570 (sh construction of wire crated r/ wall at rd 2/750 to 2/790).
Read moreRestoration of rain damages on pbat road km. 19/0 to 34/400 (sh- construction of r/wall in wire crate at rd 23/700 to 23/738)
Restoration of rain damages on pbat road km. 19/0 to 34/400 (sh- construction of r/wall in wire crate at rd 23/700 to 23/738)
Read moreof your Industry type