Tender Details
Particulars | Details |
---|---|
Title |
Job 2 Upgradation Of Laluwal To Gondpur Jai Chand Road Km. 0 0 To 6 315 Sub Head P.L Gsb, Wmm, Dbm And Bc Km. 0 0 To 2 500 And C.C. Pavement, C.O Retaining Wall, Breast Wall, Cd, U Shape Drain, Parapet, P.F Cat Eye, Delinators Etc.
|
Description |
Job 2 Upgradation Of Laluwal To Gondpur Jai Chand Road Km. 0 0 To 6 315 Sub Head P.L Gsb, Wmm, Dbm And Bc Km. 0 0 To 2 500 And C.C. Pavement, C.O Retaining Wall, Breast Wall, Cd, U Shape Drain, Parapet, P.F Cat Eye, Delinators Etc.
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_86748_1 |
Reference Number |
Job 2 Upgradation of Laluwal to Gondpur Jai Chand Road km. 0-0 to 6-315 Sub Head P.L GSB, WMM, DBM |
Tender Fee | 5000 |
EMD | 6.63 Lakh |
Tender Value | |
Place | Una |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=129033 |
Start Date | February 22, 2024 22:30 |
End Date |
27/02/2024 ( Expired 419 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation of link road umrali dhilwan heeran thara pubowal to polian via kuthar beet from km 0/00 to 3/400 (sh fc, cd,p/l gsb,wmm,dbm,bc c/o cc pavement, u-shape drain, parapets km 0/0 to 3/400 and road side furniture etc.) under otmnp
Upgradation of link road umrali dhilwan heeran thara pubowal to polian via kuthar beet from km 0/00 to 3/400 (sh fc, cd,p/l gsb,wmm,dbm,bc c/o cc pavement, u-shape drain, parapets km 0/0 to 3/400 and road side furniture etc.) under otmnp
Read moreUpgradation of link road from barring to tibok, othang and yangthang km. 0/00 to 9/215 under nabard-ridf-xxx sh rofd, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, wire crate and sign board etc.
Upgradation of link road from barring to tibok, othang and yangthang km. 0/00 to 9/215 under nabard-ridf-xxx sh rofd, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, wire crate and sign board etc.
Read moreP and l spreading and compaction of wmm 100 mm in 01 layer wmm 75 mm each in 02 layers dbm 60 mm and bc 30 mm and apply pc and tc and rd marking as per morth specn bet km 0 to km 2 pt 8 on hq 136 i inf bde gp to fsc pooh ex 2136 fd hosp pro deepak
P and l spreading and compaction of wmm 100 mm in 01 layer wmm 75 mm each in 02 layers dbm 60 mm and bc 30 mm and apply pc and tc and rd marking as per morth specn bet km 0 to km 2 pt 8 on hq 136 i inf bde gp to fsc pooh ex 2136 fd hosp pro deepak
Read moreUpgradation of link road from barring to tibok, othang and yangthang km. 0/00 to 9/215 under nabard-ridf-xxx sh rofd, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, wire crate and sign board etc.
Upgradation of link road from barring to tibok, othang and yangthang km. 0/00 to 9/215 under nabard-ridf-xxx sh rofd, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, wire crate and sign board etc.
Read moreJob 1 construction of and m.t shaheed amol kalia basti chintpurni to kinnu via raida paida duhal bangwalan road including bridge from km. 0-0 to 9-570 sub head formation cutting, retaining walls, cd works, gsb, wmm, 30mm thick sdbc, c.c. pavement, in
Job 1 construction of and m.t shaheed amol kalia basti chintpurni to kinnu via raida paida duhal bangwalan road including bridge from km. 0-0 to 9-570 sub head formation cutting, retaining walls, cd works, gsb, wmm, 30mm thick sdbc, c.c. pavement, in
Read moreConstruction and mt on link road banne di hatti to ghewat bahed road from km. 0-0 to
Construction and mt on link road banne di hatti to ghewat bahed road from km. 0-0 to &#x0d 4-520 sub head balance work of c.o retaining wall, cross drainage work, gsb, wmm, metaling tarring and u-shape drain and crash barriers etc. at various rds under
Read moreJob 2 construction and m.t of link road raipur to bakhawa via mallan da pind km. 0-0 to 3-800, sub head balance work of c.o retaining wall, cross drainage work, road side pcc drain and parapets etc. in km. 0-0 to 3-800 under nabard ridf-xxviii
Job 2 construction and m.t of link road raipur to bakhawa via mallan da pind km. 0-0 to 3-800, sub head balance work of c.o retaining wall, cross drainage work, road side pcc drain and parapets etc. in km. 0-0 to 3-800 under nabard ridf-xxviii
Read moreFlood mitigation on bhuntar garsa road km. 0/00 to 2/850 (sh construction of rcc retaining wall with spur and embankment filling, metalling and tarring, u-shape drain and w metal beam crash barrier
Flood mitigation on bhuntar garsa road km. 0/00 to 2/850 (sh construction of rcc retaining wall with spur and embankment filling, metalling and tarring, u-shape drain and w metal beam crash barrier
Read moreConstruction of link road from naggar to karishna mandir via thawa up to chachogi km. 0/00 to 3/600 under nabard-ridf-xxx sh ford, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, w-metal beam crash barrier etc.
Construction of link road from naggar to karishna mandir via thawa up to chachogi km. 0/00 to 3/600 under nabard-ridf-xxx sh ford, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, w-metal beam crash barrier etc.
Read moreProviding and laying of wmm 100 mm two layer dbm 60 mm bc 50 mm prime coat tack coat and road marking with thermoplastic paint 2 pt 5 mm thick road stud and delinators for surf work betn km 3 to 16 on rd nganglam-deothang under project dantak bhutan
Providing and laying of wmm 100 mm two layer dbm 60 mm bc 50 mm prime coat tack coat and road marking with thermoplastic paint 2 pt 5 mm thick road stud and delinators for surf work betn km 3 to 16 on rd nganglam-deothang under project dantak bhutan
Read moreof your Industry type