Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of 02 Nos Of 4000 Gpm Pump Motor At Jharlahi Patch For Extraction Of Coal From Floor Of Sump At Phularitand, Amp Colliery
|
| Description |
Shifting Of 02 Nos Of 4000 Gpm Pump Motor At 
Jharlahi Patch For Extraction Of Coal From Floor Of 
Sump At Phularitand, Amp Colliery
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_336671_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2025-26/045 |
| Tender Fee | 0 |
| EMD | 3100 |
| Tender Value | - |
| Place | AMP COLLIERY, BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348999 |
| Start Date | June 01, 2025 00:00 |
| End Date |
Expired
11/06/2025
Expired 453 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Di of two 10inch dia m.s. pipes range of two 4000gpm pump motor 02times for coal extraction of floor face at jarlahi patch of phularitand, amp colliery.
Di of two 10inch dia m.s. pipes range of two 4000gpm pump motor 02times for coal extraction of floor 
 face at jarlahi patch of phularitand, amp colliery.
Read moreDi of 10inch dia m.s.pipe line along with shifting of 2nd 4000gpm pump motor 03times at jarlahi patch of phularitand, amp colliery.
Di of 10inch dia m.s.pipe line along with shifting of 2nd 4000gpm pump motor 03times at jarlahi patch of phularitand, amp colliery.
Read moreShifting of 4000gpm ht pump in lower side of the sump three times due to decreasing of water level of main water sump of phularitand, amp colliery.
Shifting of 4000gpm ht pump in lower side of the sump 
 three times due to decreasing of water level of main water 
 sump of phularitand, amp colliery.
Read moreRepairing of 6.6kv, 400amps starter, sait mineline make, for controlling 4000gpm pump of jarlahi patch of phularitand, amp colliery.
Repairing of 6.6kv, 400amps starter, sait mineline make, for controlling 4000gpm pump of jarlahi patch of phularitand, amp colliery.
Read moreRepairing of 3.3kv, 400amps vcb er volga make for controlling of 4000gpm pump motor main patch of phularitand, amp colliery.
Repairing of 3.3kv, 400amps vcb er volga make 
 for controlling of 4000gpm pump motor main patch 
 of phularitand, amp colliery.
Read moreLowering of 4000gpm ht pump with pontoon in lower side of the sump three times due to decreasing of water level of jarlahi patch of phularitand, amp colliery.
Lowering of 4000gpm ht pump with pontoon in lower side of the sump three times due to decreasing of water level of jarlahi patch of phularitand, amp colliery.
Read moreDi of 10inch/8inch dia m.s.pipe line along with shifting of 4000gpm pump motor for fast discharging of mine water at jarlahi patch of phularitand, amp colliery.
Di of 10inch/8inch dia m.s.pipe line along with 
 shifting of 4000gpm pump motor for fast 
 discharging of mine water at jarlahi patch of 
 phularitand, amp colliery.
Read more(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
Read moreFour times shifting of 2000gpm pump motor in safe/suitable side of the sump along with di of its pipe line due to extraction of floor coal of jarlahi coal face sump at phularitand under amp colliery
Four times shifting of 2000gpm pump motor in safe/suitable side of the sump along with di of its pipe 
 line due to extraction of floor coal of jarlahi coal face sump at phularitand under amp colliery
Read moreShifting of 4000gpm pump motor set (four times) after and before extraction of coal from the floor of jarlahi coal face and diversion of its pipe line due to safety purpose at phularitand under amp colliery.
Shifting of 4000gpm pump motor set (four times) after and before extraction of coal from the floor of jarlahi coal face and diversion of its pipe line due to safety purpose at phularitand under amp colliery.
Read moreof your Industry type