Tender Details
Particulars | Details |
---|---|
Title |
Ohe Work In Connection With The Provision Of 2 Lane Road Over Bridge (Rob) In Lieu Of Lc No: 192 Of Kota Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79995412 |
Reference Number |
EL-TRD-50-15-2024-25 |
Tender Fee | 0 |
EMD | 53400 |
Tender Value | |
Place | Jabalpur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/032025/79995412/viewNitPdf_4858715.pdf |
Start Date | February 06, 2025 22:40 |
End Date |
03/03/2025 ( Expired 95 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreConstruction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Read moreof your Industry type