Tender Details

Particulars Details
Title
Ohe Work In Connection With Provision Of New Foot Over Bridge (Fob) At Adityapur Station In Ckp Division.
Description
Ohe Work In Connection With Provision Of New Foot Over Bridge (Fob) At Adityapur Station In Ckp Division.
Organisation Ministry of Railways
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date October 09, 2026 00:52
End Date
Open 30/10/2026

15 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of foot over bridge (fob) at digha railway station.

Construction of foot over bridge (fob) at digha railway station.

Read more
Ohe modification work in connection with construction of 03 nos.full length stabling line towards dn grid at adityapur yd. in ckp division.

Ohe modification work in connection with construction of 03 nos.full length stabling line towards dn grid at adityapur yd. in ckp division.

Read more
Ohe modification and other allied work in connection with capacity augmentation rom 200 locos to 250 locos at electric loco shed,6.10m foot over bridge at surat end and ahemdabad end, and foot over bridge with parcel lift at vadodara station.

Ohe modification and other allied work in connection with capacity augmentation rom 200 locos to 250 locos at electric loco shed,6.10m foot over bridge at surat end and ahemdabad end, and foot over bridge with parcel lift at vadodara station.

Read more
Construction of foot over bridge on replacement of existing destressed bridge on masjid station at km 0/5-6 bhandari fob & km 1/2-3 station fob. (mcgm deposit work)

Construction of foot over bridge on replacement of existing destressed bridge on masjid station at km 0/5-6 bhandari fob & km 1/2-3 station fob. (mcgm deposit work)

Read more
Appointment of contractor for construction of foot over bridge (fob) across western express highway at gundavali metro station (metro line 7).

Appointment of contractor for construction of foot over bridge (fob) across western express highway at gundavali metro station (metro line 7).

Read more
Ohe work in connection with construction of a loop line for 3rd line at tabu in ckp division.

Ohe work in connection with construction of a loop line for 3rd line at tabu in ckp division.

Read more
Repair of dawaran uri foot bridge over river jhelum

Repair of dawaran uri foot bridge over river jhelum

Read more
Design, engineering, procurement, manufacture, fabrication, supply, transportation, construction, erection, testing commissioning, operations management for 3 years of foot over bridge (fob) at ada office, aligarh

Design, engineering, procurement, manufacture, fabrication, supply, transportation, construction, erection, testing commissioning, operations management for 3 years of foot over bridge (fob) at ada office, aligarh

Read more
Replacement of connecting foot over bridge at mp-idsa, new delhi

Replacement of connecting foot over bridge at mp-idsa, new delhi

Read more
Trimming of tree branches to maintain safety clearance from ohe in different ohe depot jurisdiction of ckp division for one year.

Trimming of tree branches to maintain safety clearance from ohe in different ohe depot jurisdiction of ckp division for one year.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise