Tender Details

About Tender

🏗️ Invitation For Bids: Construction Project In Rajasthan 🛣️🏘️ The Ministry Of Road Transport And Highways, Under The Central Government, Invites Bids From Reputable Contractors For The Construction Of A 2 Lane Road With A Paved Shoulder, Including A Bypass And A New Railway Over Bridge (Rob) To Connect Mandal Town In District Bhilwara To Nh 158 And Nh 48 In The State Of Rajasthan. 📅 Bid Submission Deadline: May 14, 2024, 11:00 Am Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 49,96,000 This Project Will Be Executed On An Engineering, Procurement, And Construction (Epc) Basis. Interested Bidders Should Submit Detailed Proposals, Including Technical And Financial Bids, In Accordance With The Project Specifications And Guidelines. Keywords: Construction, Epc Mode, Road Infrastructure, Highway, Bypass, Railway Over Bridge, Rajasthan, Ministry Of Road Transport And Highways, Government Tender, Bid Submission
Particulars Details
Title
Construction Of 2 Lane With Paved Shoulder Configuration Of Bypass With Provision Of New Rob To Mandal Town District Bhilwara With Connecting Nh 158 To Nh 48 In The State Of Rajasthan On Epc Mode
Description
Construction Of 2 Lane With Paved Shoulder Configuration Of Bypass With Provision Of New Rob To Mandal Town District Bhilwara With Connecting Nh 158 To Nh 48 In The State Of Rajasthan On Epc Mode
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_799478_1
Reference
Number
NIT NO.-05/2023-24
Tender Fee 10000
EMD 49.96 Lakh
Tender Value -
Place PIU BEAWAR
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840386

Start Date March 09, 2024 14:30
End Date
Expired 29/05/2024

Expired 869 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra

Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra

Read more
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)

Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)

Read more
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.

Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.

Read more
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh

Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh

Read more
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode

Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise