Tender Details

Particulars Details
Title
Hot Plate A3 & A4 Size
Description
Organisation Department of Earth Sciences | Ministry of Earth Sciences
Tender Id GEM/2025/B/6443764
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date July 16, 2025 22:11
End Date
Expired 06/08/2025

Expired 430 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 7 Lakhs Experience with Gov. Required: Years
Buyer Name: Vidhya Sandeep Deshmukh
Ministry: Ministry Of Earth Sciences
Department: Department Of Earth Sciences
Organisation: National Centre For Antarctic And Ocean Research (ncaor)
Similar Tenders
Supply of control damper assembly for mill hot primary air of unit-xi boiler

Supply of control damper assembly for mill hot primary air of unit-xi boiler

Read more
Supply of ss plate gr-309s for reconditioning the coal nozzle tips

Supply of ss plate gr-309s for reconditioning the coal nozzle tips

Read more
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Read more
Procurement of locking plate w/nut for scrape for use at jvroc-ii sathupally area.

Procurement of locking plate w/nut for scrape for use at jvroc-ii sathupally area.

Read more
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.

Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.

Read more
Four no boring and construction oif mcu room and drain and its plate in the campous of mandal kara munger 2026-27

Four no boring and construction oif mcu room and drain and its plate in the campous of mandal kara munger 2026-27

Read more
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Read more
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally

Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally

Read more
Tggenco - ytps - electrification of ash silo gate including supply and fixing of 150w and 60w high bay lights, 24v led lights for name plate ss letters at yadadri thermal power station at veerlapalem (v), damercherla (m), nalgonda (d)

Tggenco - ytps - electrification of ash silo gate including supply and fixing of 150w and 60w high bay lights, 24v led lights for name plate ss letters at yadadri thermal power station at veerlapalem (v), damercherla (m), nalgonda (d)

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise