Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Deputation Of Service Engineer For Inspection And To Find Out Any Complaints For The Belt Pro Make Hot Vulcanizing Machines In Mm/Chp/Ktps V And Vi Stages.
|
| Description |
Deputation Of Service Engineer For Inspection And To Find Out Any Complaints For The Belt Pro Make Hot Vulcanizing Machines In Mm/Chp/Ktps V And Vi Stages.
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-CE KTPS V & VI STAGE |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 44000 |
| Place | Telangana |
| Link | Login to view |
| Start Date | September 24, 2026 23:30 |
| End Date |
Open
23/10/2026
12 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ktps-v vi stages-civil -o m-ii - clearing of thick jungle, vegetation and bushes along the railway track at certain locations in marshalling yard and gajulagudem area in ktps v vi stages and ktps-v vi stages- civil- o m-ii- clearing of residual coal fallen from bobr wagons along the railway track at certain locations in marshalling yard of ktps v vi stages
Ktps-v vi stages-civil -o m-ii - clearing of thick jungle, vegetation and bushes along the railway track at certain locations in marshalling yard and gajulagudem area in ktps v vi stages and ktps-v vi stages- civil- o m-ii- clearing of residual coal fallen from bobr wagons along the railway track at certain locations in marshalling yard of ktps v vi stages
Read moreLaminated photo identity cards for employees and artisans working under ktps v and vi stages
Laminated photo identity cards for employees and artisans working under ktps v and vi stages
Read moreConducting external safety audit (esa) for entire ktps-v and vi stages plant premises for the year 2026-27
Conducting external safety audit (esa) for entire ktps-v and vi stages plant premises for the year 2026-27
Read moreAnnual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreReplacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Read moreKtps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreKtps-v vi stages
Engaging of 16/17ton lorry along with driver cleaner on hire basis for a mileage up to 12000km/year and usage time of 8hrs/day for official utilization of stores and services division/ktps-vvi stages for the year 2024-25 i.e., from actual date of utilization to dt:31.03.2025 with year of manufacturing on or after 2015.
Read moreof your Industry type