Tender Details
Particulars | Details |
---|---|
Title |
Rate Per Veh Km Per Ton In Hcp Rohtang Axis Area,Rate Per Veh Km Per Ton In Hcp Zozila Axis Area,Ra
|
Description |
|
Organisation | Department of Defence | Ministry of Defence |
Tender Id | GEM/2024/B/5405129 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | 2 Crore |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | November 11, 2024 02:36 |
End Date |
02/12/2024 ( Expired 191 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreConstruction work of suspension bridge 90 mtr span at km 26, x/s 25/17 to 25/21 of panchkedar sri masta-madhmaheswar temple briddle path in kedarnath legislative assembly area in ukhimath block in district rudraprayag honble c.m. gosh.no. 438/2024
Construction work of suspension bridge 90 mtr span at km 26, x/s 25/17 to 25/21 of panchkedar sri masta-madhmaheswar temple briddle path in kedarnath legislative assembly area in ukhimath block in district rudraprayag honble c.m. gosh.no. 438/2024
Read moreStrengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Read moreDecorative pole lamp work in different places of municipal area as per estimate
Decorative pole lamp work in different places of municipal area as per estimate
Read moreSeventeen load carrier vehicles via rohtang or zozila axis,approx night halts via rohtang or zozila
Read more
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreGoods transport service – per km based service - household/office; truck 8 oblique 9 ton; heavy d
Read more
Annual rate contract for repairing work of tubewell, and water supply pipe line in mcb area.
Annual rate contract for repairing work of tubewell, and water supply pipe line in mcb area.
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreof your Industry type