Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Mech Ii Bm Unit Iii Inspection Of Platen Water Wall Headers Removal Of Debris And Strengthening Of Eroded Weld Joints In Steam Cooled Wall Outlet Header During 2025 2026 Overhaul
|
| Description |
Ttps Mech Ii Bm Unit Iii Inspection Of Platen Water Wall Headers Removal Of Debris And Strengthening Of Eroded Weld Joints In Steam Cooled Wall Outlet Header During 2025 2026 Overhaul
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_581949_1 |
|
Reference Number |
CE/TTPS/SE/M-II/No.177/2025-26 |
| Tender Fee | 0 |
| EMD | 2200 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=695421 |
| Start Date | July 15, 2025 19:30 |
| End Date |
Expired
01/08/2025
Expired 439 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii bm unit iii replacement of wornout supports of eco hoppers inspection of water wall ring headers removal of debris and strengthening of economizer inlet header eco intermediate header steam cooled wall header no 8 and ltsh inlet header d
Ttps mech ii bm unit iii replacement of wornout supports of eco hoppers inspection of water wall ring headers removal of debris and strengthening of economizer inlet header eco intermediate header steam cooled wall header no 8 and ltsh inlet header d
Read moreTtps mechiibmunit iiioverhauling of load hangers of critical pipe lines headers of boiler during the overhaul in 20262027
Ttps mechiibmunit iiioverhauling of load hangers of critical pipe lines headers of boiler during the overhaul in 20262027
Read moreTtps mech ii bm unit v overhauling of load hangers of critical pipe lines headers of boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit v overhauling of load hangers of critical pipe lines headers of boiler during overhaul for the year 2026 2027
Read moreTtps mech ii bm unit v cleaning of ash deposits from the headers supply tubes hangers in penthouse during overhaul for the year 2026 2027
Ttps mech ii bm unit v cleaning of ash deposits from the headers supply tubes hangers in penthouse during overhaul for the year 2026 2027
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports strengthening of weld joints and painting the steel structures of unit iii boiler roof
Ttps mech ii bm unit iii replacement of wornout corroded structural supports strengthening of weld joints and painting the steel structures of unit iii boiler roof
Read moreTtps mech ii bm unit iii replacement of plugged eroded economizer coil assemblies from right end to middle area in unit iii boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit iii replacement of plugged eroded economizer coil assemblies from right end to middle area in unit iii boiler during overhaul for the year 2026 2027
Read moreTtps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Read moreTtps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Read moreof your Industry type