Tender Details

Particulars Details
Title
Ttps Mech Ii Bm Unit I Inspection Of Water Wall Ring Headers Steam Cooled Wall Inlet Header Removal Of Debris And Strengthening Of Eroded Weld Joints In Left And Right Side Steam Cooled Wall During 2024 2025 Overhaul
Description
Ttps Mech Ii Bm Unit I Inspection Of Water Wall Ring Headers Steam Cooled Wall Inlet Header Removal Of Debris And Strengthening Of Eroded Weld Joints In Left And Right Side Steam Cooled Wall During 2024 2025 Overhaul
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_461900_1
Reference
Number
CE/TTPS/SE/M-II/No.357/2024-25
Tender Fee 0
EMD 3500
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=548904
Start Date July 10, 2024 23:30
End Date

26/07/2024 ( Expired 347 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ttps mech ii tm i unit iii overhauling of steam and condensate valves flange gasket renewal and machining of valves yoke bush in main turbine system during annual overhaul 2025 26

Ttps mech ii tm i unit iii overhauling of steam and condensate valves flange gasket renewal and machining of valves yoke bush in main turbine system during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii condenser repairing and arresting the leak points in the longitudinal bellows and side walls of lpt exhaust hood during annual overhaul 2025 26

Ttps mech ii tm i unit iii condenser repairing and arresting the leak points in the longitudinal bellows and side walls of lpt exhaust hood during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves during annual overhaul 2025 26

Ttps mech ii tm i unit iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii renewel of piston seals piston rod packings in hp lp bypass valves and its spray valves actuators including servicing of oil filters during annual overhaul 2025 26

Ttps mech ii tm i unit iii renewel of piston seals piston rod packings in hp lp bypass valves and its spray valves actuators including servicing of oil filters during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii inspection of tg bearings of 210mw lmw design turbine during annual overhaul 2025 26

Ttps mech ii tm i unit iii inspection of tg bearings of 210mw lmw design turbine during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii overhauling of turbine lub oil system seal oil system valves and equipments during annual overhaul 2025 26

Ttps mech ii tm i unit iii overhauling of turbine lub oil system seal oil system valves and equipments during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26

Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii inspection of governing elements checking h gap mop float renewal of mop bearings if necessary overhauling of cvsm pilot feed back pilot and intermediate pilot valves mop nrv etc during annual overhaul 2025 26

Ttps mech ii tm i unit iii inspection of governing elements checking h gap mop float renewal of mop bearings if necessary overhauling of cvsm pilot feed back pilot and intermediate pilot valves mop nrv etc during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2025 26

Ttps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii overhauling of steam and condensate valves of turbine regeneration system during annual overhaul 2025 26

Ttps mech ii tm i unit iii overhauling of steam and condensate valves of turbine regeneration system during annual overhaul 2025 26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise