Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit Iv Renewal Of Eroded Damaged Erosion Protection Shields Of Steam Cooled Wall Extended Steam Cooled Wall And Water Wall Screen Hanger Tubes For Unit Iv Boiler During 2024 25 Overhaul
|
Description |
Ttps Mech Ii Bm Unit Iv Renewal Of Eroded Damaged Erosion Protection Shields Of Steam Cooled Wall Extended Steam Cooled Wall And Water Wall Screen Hanger Tubes For Unit Iv Boiler During 2024 25 Overhaul
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_455081_1 |
Reference Number |
CE/TTPS/SE/M-II/No.241/2024-25 |
Tender Fee | 0 |
EMD | 900 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=541329 |
Start Date | June 17, 2024 19:30 |
End Date |
02/07/2024 ( Expired 294 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bm-attending boiler eroded tubes repalcement and weding works at economizer coils in unit-9 during annual overhaul period of unit-9.
Bm-attending boiler eroded tubes replacement and welding works at economizer coils in unit-9 during annual overhaul period of unit-9.
Read moreTtps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Ttps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Read moreTtps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Ttps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Read moreTtps mech ii bm unit iv v cleaning of boiler iv v zero meter area for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iv v cleaning of boiler iv v zero meter area for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm rubber lining in pressure vessels alkali and acid dg water storage tanks and pipe lines etc during breakdown overhaul of equipments in dm plant i ii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm rubber lining in pressure vessels alkali and acid dg water storage tanks and pipe lines etc during breakdown overhaul of equipments in dm plant i ii for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit iv v attending breakdown works in hp valves actuators safety valves wb lrsb prds etc and cleaning of i ii pass boiler structures from 0 metre to 56 metre elevation in unit iv v boiler for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iv v attending breakdown works in hp valves actuators safety valves wb lrsb prds etc and cleaning of i ii pass boiler structures from 0 metre to 56 metre elevation in unit iv v boiler for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit i to v monitoring of water wall soot blowers and long retractable soot blowers during daily operation in unit i to v boilers and retracting the swivel tubes and lance tubes if any stuck up found for the period from 01 04 2025 to
Ttps mech ii bm unit i to v monitoring of water wall soot blowers and long retractable soot blowers during daily operation in unit i to v boilers and retracting the swivel tubes and lance tubes if any stuck up found for the period from 01 04 2025 to
Read moreTtps mech ii bm unit iv v boiler prive and breakdown maintenance works in burner and h o guns for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iv v boiler prive and breakdown maintenance works in burner and h o guns for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iv boiler during 2025 2026 overhaul
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iv boiler during 2025 2026 overhaul
Read moreTtps mech ii bm unit ii reconditioning of coal nozzle and matching with coal nozzle tips released from unit ii boiler during 2025 2026 overhaul
Ttps mech ii bm unit ii reconditioning of coal nozzle and matching with coal nozzle tips released from unit ii boiler during 2025 2026 overhaul
Read moreof your Industry type