Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit Iv Removal Of Eroded Damaged Erosion Protection End Shields Cassette Baffles Of Unit Iv Economizer Coil And Erection Of New Shields During Overhaul 2023 2024
|
Description |
Ttps Mech Ii Bm Unit Iv Removal Of Eroded Damaged Erosion Protection End Shields Cassette Baffles Of Unit Iv Economizer Coil And Erection Of New Shields During Overhaul 2023 2024
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_345827_1 |
Reference Number |
SE/M.II/TTPS/No.260/2023-2024 |
Tender Fee | 0 |
EMD | 1100 |
Tender Value | |
Place | O/o SE/M.II/TTPS |
Link | https://tntenders.gov.in |
Start Date | July 18, 2023 19:30 |
End Date |
24/07/2023 ( Expired 715 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii tm i unit iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves during annual overhaul 2025 26
Ttps mech ii tm i unit iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves during annual overhaul 2025 26
Read moreTtps mech ii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during annual overhaul 2025 26
Ttps mech ii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during annual overhaul 2025 26
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Ttps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Read moreTtps operation circle mpm ii unit iv overhauling of gravimetric feeder, bunker gates, hag, cag, had, cad, and painting of cold air duct and feeder during the forthcoming overhaul
Ttps operation circle mpm ii unit iv overhauling of gravimetric feeder, bunker gates, hag, cag, had, cad, and painting of cold air duct and feeder during the forthcoming overhaul
Read moreTtps operation circle mpm ii unit iv replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Ttps operation circle mpm ii unit iv replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Read moreTtps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Read moreKtps-v stage- bm- bending fabrication and erection of the damaged worn-out portion replacement of guide vanes for flue gas ducts of unit9 during overhaul of unit9
Ktps-v stage- bm- bending fabrication and erection of the damaged worn-out portion replacement of guide vanes for flue gas ducts of unit9 during overhaul of unit9-reg
Read moreProcurement of primary super heater bank coil along with accessories i.e. suction support, spacer armchair, spacer bedstead, stringer coat hook, scallop pad, erosion shield, cassette baffles and necessary support of unit 3 n 4 sgtps, sgtps, mppgcl
Procurement of primary super heater bank coil along with accessories i.e. suction support, spacer armchair, spacer bedstead, stringer coat hook, scallop pad, erosion shield, cassette baffles and necessary support as per design of unit no. 3 n 4
Read moreof your Industry type