Particulars | Details |
---|---|
Title |
Erection Of Stay In 11k V Ohl And Installation Of Bus Bar Chamber Along With Laying Of Cables At Rohini Main Substation (2 X3 Mva, 11k V 3.3k V) And Installation Of Lightning Arrestor In Ht Ohl Along With Making An Connection With Earth Pits At Rohini
|
Description |
Erection Of Stay In 11k V Ohl And Installation Of Bus Bar Chamber Along With Laying Of Cables At Rohini Main Sub Station (2 X3 Mva, 11k V By 3.3k V) And Installation Of Lightning Arrestor In Ht Ohl Along With Making An Connection With Earth Pits At Ro
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_312655_1 |
Reference Number |
PE(EnM)/RH/eNIT/2024-25/01 |
Tender Fee | 0 |
EMD | 4750 |
Tender Value | |
Place | Rohini Project, NK Area, CCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324006 |
Start Date | July 16, 2024 16:30 |
End Date |
25/07/2024 ( Expired 317 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, erection, testing , commissioning for augmentation from 250 kva to 400 kva substation along with replacement of conductor with lt ab cable and installation of 11kv ct/pt (15/5amp) at nowabad fish fram, under the jurisdiction of electric di
Supply, erection, testing and commissioning for augmentation from 250 kva to 400 kva substation along with replacement of conductor with lt ab cable and installation of 11kv ct pt (15 5amp) at nowabad fish fram, under the jurisdiction of electric
Read moreSupply, installation, connection and commissioning of 08 nos. bore type earth pit along with the work of pipeline for maintaining satisfactory earthing value of all earth pits at 132/33 kv gss mango (baliguma)
Supply, installation, connection and commissioning of 08 nos. bore type earth pit along with the work of pipeline for maintaining satisfactory earthing value of all earth pits at 132/33 kv gss mango (baliguma)
Read moreCarrying out mechanical works in connection with fabrication, erection, testing and commissioning of petroleum product and fire hydrant piping, supply installation, testing and commissioning of mechanized oil water separator, along with allied works
Carrying out mechanical works in connection with fabrication, erection, testing and commissioning of petroleum product and fire hydrant piping, supply installation, testing and commissioning of mechanized oil water separator, along with allied works
Read moreInstallation of 3.3 kv, 300kvar capacitor bank with control panels and shed foundation and connected to the 2.5 mva secondary side switch of 11kv/3.3kv main substation jocp under hazaribag area
Installation of 3.3 kv, 300kvar capacitor bank with control panels and shed foundation and connected to the 2.5 mva secondary side switch of 11kv/3.3kv main substation jocp under hazaribag area
Read moreDi of existing 3.3kv/6.6kv ht oh line near hemm workshop along with the main lv road for removal of hindrance in construction of workshop by m/s ashok mittal at biana project.
Di of existing 3.3kv/6.6kv ht oh line near hemm workshop along with the main lv road for removal of hindrance in construction of workshop by m/s ashok mittal at biana project.
Read moreErection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Erection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Read moreDrawal of lt and ht ug cables along with installation of new dtrs, lt kiosks, fpbs, dbs for lt ug ring main works at bb and bc block, aaia under newtown division
Drawal of lt and ht ug cables along with installation of new dtrs, lt kiosks, fpbs, dbs for lt ug ring main works at bb and bc block, aa-ia under newtown division
Read moreErection of sub-station,ht and lt line with installation of 25 kva dtr for effecting new 3 (three) nos, ldtw service connection at mouza- bhaghasole in keshpurblock
Erection of sub-station,ht and lt line with installation of 25 kva dtr for effecting new 3 (three) nos, ldtw service connection at mouza- bhaghasole in keshpurblock
Read moreProvision of sub-main wiring for installation ups input/output connection along with power plug point in the various location in the sart building and installation of 40kva ups along with suitable distribution system at entire old block of hss dept.
Provision of sub-main wiring for installation ups input/output connection along with power plug point in the various location in the sart building and installation of 40kva ups along with suitable distribution system at entire old block of hss dept.
Read moreInstallation of 1.6 mva power transformer and 500kva 3.3kv/440volt transformer with bus bar, earthing arrangement , renovation of 440volt oh for providing power to movable mobile crusher at coal stock at karma main substation under kuju area
Installation of 1.6 mva power transformer and 500kva 3.3kv/440volt transformer with bus bar, earthing arrangement , renovation of 440volt oh for providing power to movable mobile crusher at coal stock at karma main substation under kuju area
Read moreof your Industry type