Installation Of Lightning Arrestor, Goab, Earth Pit Along With Accessories In 11k V Overhead Line At Main Sub Station (2 X3 Mva) And Dismantling Erection Of Overhead Line At Weighbridge No. 01, Under Rohini Ocp, Nk Area
Description
Installation Of Lightning Arrestor, &#X0d Goab, Earth Pit Along With &#X0d Accessories In 11k V Overhead &#X0d Line At Main Sub Station &#X0d (2 X3 Mva) And Dismantling&#X0d Erection Of Overhead Line At &#X0d Weighbridge No 01, Under &#X0d Rohini Ocp, Nk Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_320931_1
Reference
Number
PE(EnM)/RH/eNIT/2024-25/08
Tender Fee 0
EMD 5400
Tender Value
Place Rohini Project, NK Area, CCL
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339400
Start Date February 01, 2025 15:30
End Date

10/02/2025 ( Expired 140 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance of 3.3kv oh line from dumerbera sub-station to 16b quarry and installation of 400a rated goab and do fuse at 16b quarry for safe operation 250kva 3.3kv/440v transformer installated at 16b quarry of ara colliery under kuju

Maintenance of 3.3kv oh line from dumerbera sub-station to 16b quarry and installation of 400a rated goab and do fuse at 16b quarry for safe operation 250kva 3.3kv/440v transformer installated at 16b quarry of ara colliery under kuju

Read more
Replacement of damaged/burnt 33 kv goab switch do fuse at sector b main sub station (33/6.6/3.3 kv) of rajnagar ocm , hasdeo area

Replacement of damaged/burnt 33 kv goab switch do fuse at sector b main sub station (33/6.6/3.3 kv) of rajnagar ocm , hasdeo area

Read more
Repairing and fixing of wti and oit and buchholz relay along with painting of one (01) no. 11kv/3.3kv, 3mva and one no. 11kv/3.3kv, 2.5 mva transformer at 02 no. sub-station considering dgms guideline and safety of the equipment under katahra collier

Repairing and fixing of wti and oit and buchholz relay along with painting of one (01) no. 11kv/3.3kv, 3mva and one no. 11kv/3.3kv, 2.5 mva transformer at 02 no. sub-station considering dgms guideline and safety of the equipment under katahra collier

Read more
Dismantling and installation of andrew yule make power transformer, 33kv/11kv, 5/7.5 mva, si. no12307,including installation of circuit breaker, current transformer and structural work for new power way at madhuban d.g. sub- station of block-ii a

Dismantling and installation of andrew yule make power transformer, 33kv/11kv, 5/7.5 mva, si. no12307,including installation of circuit breaker, current transformer and structural work for new power way at madhuban d.g. sub- station of block-ii a

Read more
Complete repairing of 3.3kv/400amps gec make ht ocb switch for controlling 3.3kv overhead line block-iv ocp at sub-station kali mandir of abgc under govindpur area-iii si.no 5513

Complete repairing of 3.3kv/400amps gec make ht ocb switch for controlling 3.3kv overhead line block-iv ocp at sub-station kali mandir of abgc under govindpur area-iii si.no 5513

Read more
Dismantling and re-erection of section of 440v, 3 phase 4 wire o/h distribution line at premnagar colony and sinidih officer colony under bilbera switch station, govindpur area

Dismantling and re-erection of section of 440v, 3 phase 4 wire o/h distribution line at premnagar colony and sinidih officer colony under bilbera switch station, govindpur area

Read more
(1) extention / diversion of 3.3 kv overhead line at ocp of akwmc.(2) diversion of 3.3 kv feeder to provide power to 7 seam to new location due to new bench exposed at akwmc,katras area-iv.(3) dismantling and diversion of 3.3 kv over head line for ma

(1) extention / diversion of 3.3 kv overhead line at ocp of akwmc.(2) diversion of 3.3 kv feeder to provide power to 7 seam to new location due to new bench exposed at akwmc,katras area-iv.(3) dismantling and diversion of 3.3 kv over head line for ma

Read more
Maintenance and installation of lighting arrestor station type 11kv and 3.3kv at site banwar subststion of topa project under kuju area.

Maintenance and installation of lighting arrestor station type 11kv and 3.3kv at site banwar subststion of topa project under kuju area.

Read more
Erection and di of 11kv overhead feeding power to gidi-c and religara from gidi washery substation coming under gidi-a mining area and 3.3kv overhaed line feeding power to dewatering pump at gidi-a quarry respectively and shifting of 01 no fix

Erection and di of 11kv overhead feeding power to gidi-c and religara from gidi washery substation coming under gidi-a mining area and 3.3kv overhaed line feeding power to dewatering pump at gidi-a quarry respectively and shifting of tower

Read more
1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc

1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc