Tender Details
Particulars | Details |
---|---|
Title |
Cleaning Of Blasted Carbonaceous Materials And Fallen Materials Mixed With Shale For Establishment Of Stowing Pipe Line And Drainage Of Stowing Water In Proposed Dep. With Stowing Panel S 1 And Loading Into Tubs In Narsamuda(r X) Seam Workings At Nar
|
Description |
Cleaning Of Blasted Carbonaceous Materials And Fallen Materials Mixed With Shale For Establishment Of Stowing Pipe Line And Drainage Of Stowing Water In Proposed Dep. With Stowing Panel S 1 And Loading Into Tubs In Narsamuda(r X) Seam Workings At Nar
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_315489_1 |
Reference Number |
ECL/SDPA/GM/Sur/e-Tender/2024/ 2192 dt.14.08.2024 |
Tender Fee | 0 |
EMD | 20900 |
Tender Value | |
Place | Narsamuda Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326950 |
Start Date | August 23, 2024 21:30 |
End Date |
02/09/2024 ( Expired 253 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Engagement of hired jcb renovation or making of garland drains around bichhed bandh area and over and around depillaring panels a,b,c,f and g to pr entry of monsoon water into underground workings in narsamuda (r-x) seam workings at narsamuda co
Engagement of hired jcb renovation or making of garland drains around bichhed bandh area and over and around depillaring panels a,b,c,f and g to pr entry of monsoon water into underground workings in narsamuda (r-x) seam workings at narsamuda co
Read moreWork for construction of 23 nos ventilation stopping between 45n and 46n from 12e to 19e and between 40n and 41n from 12e to 26e for proposed panel no cm2 and cm3 in no v seam of ncph colliery r-6 mine
Work for construction of 23 nos ventilation stopping between 45n and 46n from 12e to 19e and between 40n and 41n from 12e to 26e for proposed panel no cm2 and cm3 in no v seam of ncph colliery r-6 mine
Read moreWidening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Widening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Read moreConstruction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Read moreDismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Dismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Read moreConstruction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Read moreEstablishment of haulage roadway by supporting with roof bolting and corner side wall from 2wd/24l to 34l/3ed in r-vi (bonbahal) seam of khottadih colliery, pandaveswar area
Establishment of haulage roadway by supporting with roof bolting and corner side wall from 2wd/24l to 34l/3ed in r-vi (bonbahal) seam of khottadih colliery, pandaveswar area
Read moreCleaning and stacking of fallen coal with white washing along 23l from 0 dip to 17 dip in s.p. combine seam for emergency escape route of pumping operation under kumardhubi colliery.
Cleaning and stacking of fallen coal with white washing along 23l from 0 dip to 17 dip in s.p. combine seam for emergency escape route of pumping operation under kumardhubi colliery.
Read moreCleaning fallen coal and debris at 6d/shaft level to man riding level, and man riding level/6d to 2d, 2d/man riding level to 2rl, 2rl/2d to -2d,-2d/2rl to 3rl, 3rl/-2d to 3d in r-iii/ii seam of khottadih colliery, pandaveswar area
Cleaning fallen coal and debris at 6d/shaft level to man riding level, and man riding level/6d to 2d, 2d/man riding level to 2rl, 2rl/2d to -2d,-2d/2rl to 3rl, 3rl/-2d to 3d in r-iii/ii seam of khottadih colliery, pandaveswar area
Read moreCleaning and removal of spilled/fallen coal below 40n belt conveyor upto loading point and discharge point of belt conveyor and loading the same in to belt conveyor in 4a seam of wjkd colliery.
Cleaning and removal of spilled/fallen coal below 40n belt conveyor upto loading point and discharge point of belt conveyor and loading the same in to belt conveyor in 4a seam of wjkd colliery.
Read moreof your Industry type